A simulation model of earth moving operations for construction management

By: Call Number: AIT Thesis no. 1130 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1130Publication details: Bangkok : Asian Institute of Technology, 1977Description: 107 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology,1977 Summary: A mathematical simulation model is developed to forecast the operations of earthmoving in construction. A computer programme in Fortran; to handle all the possible different parameters in such as operation is presented. The model is designed to cope with labour intensive operation or capital intensive operation or a combination of both of them. Results of this investigation can be used to predetermine the optimum combination of different units in such an operation for the maximum benefits. A comparison of C.I. and L.I. processes, in respect to costs and time required for the same magnitude of work, is also investigated into.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1130 (Browse shelf(Opens below)) 1 Available 30050003022265
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1130 (Browse shelf(Opens below)) Available 30050160087747

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology,1977

A mathematical simulation model is developed to forecast the operations of earthmoving in construction. A computer programme in Fortran; to handle all the possible different parameters in such as operation is presented. The model is designed to cope with labour intensive operation or capital intensive operation or a combination of both of them. Results of this investigation can be used to predetermine the optimum combination of different units in such an operation for the maximum benefits. A comparison of C.I. and L.I. processes, in respect to costs and time required for the same magnitude of work, is also investigated into.