A survey of costs and cost escalation in construction activities in Bangkok

By: Call Number: AIT Thesis no.809 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 809Publication details: Bangkok : Asian Institute of Technology, 1975Description: 78 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1975 Summary: This research deals with the study of the effect of cost escalation in construction. Cost coefficients used to find the escalation factors for the activities in the foundation and structural parts of a construction project are analyzed herein from the data gathered in a survey conducted in Bangkok. The study is extended to the analysis of the cash flow of the project and the determination of the financial capital needed by the general contractor in case of cost escalation. This analysis is made easy by the application of the Critical Path Method of planning and scheduling construction projects. For illustration purposes, ·the foundation and structural parts of an engineering construction project of about two years duration are used as examples to show how the algorithm can be applied.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.809 (Browse shelf(Opens below)) 2 Available 30050120586606
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.809 (Browse shelf(Opens below)) Available 30050160092242

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand.

Thesis (M.Eng.) - Asian Institute of Technology, 1975

This research deals with the study of the effect of cost escalation in construction. Cost coefficients used to find the escalation factors for the activities in the foundation and structural parts of a construction project are analyzed herein from the data gathered in a survey conducted in Bangkok. The study is extended to the analysis of the cash flow of the project and the determination of the financial capital needed by the general contractor in case of cost escalation. This analysis is made easy by the application of the Critical Path Method of planning and scheduling construction projects. For illustration purposes, ·the foundation and structural parts of an engineering construction project of about two years duration are used as examples to show how the algorithm can be applied.