Cast in-situ bored piles in Bangkok clay

By: Call Number: AIT Thesis no. 213 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 213Publication details: Bangkok : Asian Institute of Technology, 1968Description: 92 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1698 Summary: Six cast-in-situ bored piles were cast with load cells placed at the pile ends. Three of them were cased piles, 15 feet long and the other three were uncased piles, 20 feet long. Both types have three different diameters of 10, 8 and 6 inches. The cyclic pile loading tests were carried out after 28 days of pile casting. All piles failed at the settlement between 0.37 to 0.55 inch. The shaft friction and the end bearing capacity of the pile were determined by load cells and by VAN WEELE method. The result obtained from VAN NEELE method was between 3 to 16 and 8 to 375 per cent different from the load cell method for shaft friction and end bearing respectively. Also the end bearing capacity factor (N) and the constant relationship (a) between the shaft friction and the strength of soil around the pile-.were computed from the results of the two methods. They were 5.2 to 12.4 and 0.18 to 0.53 respectively.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library Storage Room AIT Thesis no. 213 (Browse shelf(Opens below)) 1 Available 30050003093233
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 213 (Browse shelf(Opens below)) 2 Available 30050003093241
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 213 (Browse shelf(Opens below)) Available 30050160113964

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering at the Asian Institute of Technology, Bangkok, Thailand.

Thesis (M.Eng.) - Asian Institute of Technology, 1698

Six cast-in-situ bored piles were cast with load cells placed at the pile ends. Three of them were cased piles, 15 feet long and the other three were uncased piles, 20 feet long. Both types have three different diameters of 10, 8 and 6 inches. The cyclic pile loading tests were carried out after 28 days of pile casting. All piles failed at the settlement between 0.37 to 0.55 inch. The shaft friction and the end bearing capacity of the pile were determined by load cells and by VAN WEELE method. The result obtained from VAN NEELE method was between 3 to 16 and 8 to 375 per cent different from the load cell method for shaft friction and end bearing respectively. Also the end bearing capacity factor (N) and the constant relationship (a) between the shaft friction and the strength of soil around the pile-.were computed from the results of the two methods. They were 5.2 to 12.4 and 0.18 to 0.53 respectively.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!