Cast in-situ bored piles in Bangkok clay
Call Number: AIT Thesis no. 213 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. 213Publication details: Bangkok : Asian Institute of Technology, 1968Description: 92 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1698 Summary: Six cast-in-situ bored piles were cast with load cells placed at the pile ends. Three of them were cased piles, 15 feet long and the other three were uncased piles, 20 feet long. Both types have three different diameters of 10, 8 and 6 inches. The cyclic pile loading tests were carried out after 28 days of pile casting. All piles failed at the settlement between 0.37 to 0.55 inch. The shaft friction and the end bearing capacity of the pile were determined by load cells and by VAN WEELE method. The result obtained from VAN NEELE method was between 3 to 16 and 8 to 375 per cent different from the load cell method for shaft friction and end bearing respectively. Also the end bearing capacity factor (N) and the constant relationship (a) between the shaft friction and the strength of soil around the pile-.were computed from the results of the two methods. They were 5.2 to 12.4 and 0.18 to 0.53 respectively.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library Storage Room | AIT Thesis no. 213 (Browse shelf(Opens below)) | 1 | Available | 30050003093233 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 213 (Browse shelf(Opens below)) | 2 | Available | 30050003093241 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. 213 (Browse shelf(Opens below)) | Available | 30050160113964 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering at the Asian Institute of Technology, Bangkok, Thailand.
Thesis (M.Eng.) - Asian Institute of Technology, 1698
Six cast-in-situ bored piles were cast with load cells placed at the pile ends. Three of them were cased piles, 15 feet long and the other three were uncased piles, 20 feet long. Both types have three different diameters of 10, 8 and 6 inches. The cyclic pile loading tests were carried out after 28 days of pile casting. All piles failed at the settlement between 0.37 to 0.55 inch. The shaft friction and the end bearing capacity of the pile were determined by load cells and by VAN WEELE method. The result obtained from VAN NEELE method was between 3 to 16 and 8 to 375 per cent different from the load cell method for shaft friction and end bearing respectively. Also the end bearing capacity factor (N) and the constant relationship (a) between the shaft friction and the strength of soil around the pile-.were computed from the results of the two methods. They were 5.2 to 12.4 and 0.18 to 0.53 respectively.