Claims in building construction of Pakistan: statistical and pathogenic analysis

By: Call Number: AIT Thesis no.CM-11-08 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. CM-11-08Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2011Description: 147 leaves : illSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2011 Summary: Construction industry is getting competitive and complex due to increasing demands of the Employers and global economic downturn. This complex environment leads to claims and dispute causation which is totally counterproductive for the project Success. Therefore, this study was conducted to identify the types, causes of claims against the frequency of occurrence, degree of severity and level of importance so that preventive and corrective measures could be taken accordingly. Causes and types of claims provide the information on the elements which are responsible for claim and dispute causation in general terms with no pin pointing detail. For that matter, Pathogenic influence on the causation of claims was determined in order to know the practices, tasks, circumstances and other pathogens which lead to claim and dispute causation. Data analysis was done on the responses of 59 respondents belonging to all three target populations i.e. Employer, Consultant and Contractor. Causes and types of claims were ranked against frequency, severity and level of importance. Most important causes which have been revealed from this study are delayed payments by the Employer, competitive market forcing contractors to bid low leading to tight profit margins, ineffective planning and scheduling by Contractor, poor financial management of the Contractor, price hike of materials and increased rentals of plant & equipment, and improper technical study by the Contractor during bidding stage of the project. For types of claims, extra work claims and change claims found out to be the most critical. Case studies were conducted to figure out the pathogenic influence on claims causation; Practice, task and circumstance pathogens were found to be the main pathogens responsible for claim and dispute causation. Recommendations were developed specifically for Employers, Consultants and Contractors with the theme of preventing and avoiding claim causation.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CM-11-08 (Browse shelf(Opens below)) 1 Available 30050120334668
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CM-11-08 (Browse shelf(Opens below)) 2 Available 30050120679260
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.CM-11-08 (Browse shelf(Opens below)) Available 30050160063052
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.CM-11-08 (Browse shelf(Opens below)) 3 Available 30050120849913
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.CM-11-08 (Browse shelf(Opens below)) 4 Available 30050120914386

Thesis (M.Eng.) - Asian Institute of Technology, 2011

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction, Engineering and Infrastructure Management.

Construction industry is getting competitive and complex due to increasing demands of the Employers and global economic downturn. This complex environment leads to claims and dispute causation which is totally counterproductive for the project Success. Therefore, this study was conducted to identify the types, causes of claims against the frequency of occurrence, degree of severity and level of importance so that preventive and corrective measures could be taken accordingly. Causes and types of claims provide the information on the elements which are responsible for claim and dispute causation in general terms with no pin pointing detail. For that matter, Pathogenic influence on the causation of claims was determined in order to know the practices, tasks, circumstances and other pathogens which lead to claim and dispute causation. Data analysis was done on the responses of 59 respondents belonging to all three target populations i.e. Employer, Consultant and Contractor. Causes and types of claims were ranked against frequency, severity and level of importance. Most important causes which have been revealed from this study are delayed payments by the Employer, competitive market forcing contractors to bid low leading to tight profit margins, ineffective planning and scheduling by Contractor, poor financial management of the Contractor, price hike of materials and increased rentals of plant & equipment, and improper technical study by the Contractor during bidding stage of the project. For types of claims, extra work claims and change claims found out to be the most critical. Case studies were conducted to figure out the pathogenic influence on claims causation; Practice, task and circumstance pathogens were found to be the main pathogens responsible for claim and dispute causation. Recommendations were developed specifically for Employers, Consultants and Contractors with the theme of preventing and avoiding claim causation.