Combined operation of fuse dike and service spillway

By: Call Number: AIT Thesis no. WA-84-8 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. WA-84-8Publication details: Bangkok : Asian Institute of Technology, 1983Description: 69 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1983 Summary: An investigation was carried out to determine the optimum operation of the service spillway of Chiew Larn Dam in order to maintain both the maximum surcharge and the limiting high water level in the reservoir as controlled by the height of the fuse dike. Utilizing the head-discharge relationship from both the service spillway and the emergency spillway , reservoir routing for various inflow design floods was carried out from a number of combinations of spillway gate opening . The results obtained yield a number of combination of rises of the water level and t he outflow discharge. It was found that by means of introducing the maximum normal high water level as the starting point a nd allowing the gates to be opened gradually , the increases of the outflow discharges at the early stage of operation is gradual when compare it with the cases of fixed gate opening or step opening.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) 1 Available 30050003050399
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) 2 Available 30050003050381
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) Available 30050160035803

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1983

An investigation was carried out to determine the optimum operation of the service spillway of Chiew Larn Dam in order to maintain both the maximum surcharge and the limiting high water level in the reservoir as controlled by the height of the fuse dike. Utilizing the head-discharge relationship from both the service spillway and the emergency spillway , reservoir routing for various inflow design floods was carried out from a number of combinations of spillway gate opening . The results obtained yield a number of combination of rises of the water level and t he outflow discharge. It was found that by means of introducing the maximum normal high water level as the starting point a nd allowing the gates to be opened gradually , the increases of the outflow discharges at the early stage of operation is gradual when compare it with the cases of fixed gate opening or step opening.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!