Construction planning for the placing of large quantities of concrete
Call Number: AIT Thesis no.ST-87-02 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-87-02Publication details: Bangkok : Asian Institute of Technology, 1987Description: 126 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1987 Summary: This study is attempted to identify the problems and to explore the more advanced of technical know - how involved in the process of large concreting work. The operational sequence, placement methods and the factors which influence the progress of concreting work on various construction projects are analysed . The types of construction included in this study are dams, bridge, underground power - ho use a nd high - rise building. Comparisons of the results has shown that the continuous placement method yield the better output in placing of large amounts of concrete, especially for massive reinforced concrete structures. However, this method is still not widely accepted in many construction projects. It is recommended that further study be conducted on the possibility of using this method specifically for dams, underground and under water structures as well as mass foundations. Finally, a proposed planning mode land some relevant check lists are given as to provide construction planning for the placing of large quantities of concrete more meaningful .
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.ST-87-02 (Browse shelf(Opens below)) | 3 | Available | 30050120687289 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.ST-87-02 (Browse shelf(Opens below)) | 1 | Available | 30050160011994 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.ST-87-02 (Browse shelf(Opens below)) | 1 | Available | 30050120986962 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1987
This study is attempted to identify the problems and to explore the more advanced of technical know - how involved in the process of large concreting work. The operational sequence, placement methods and the factors which influence the progress of concreting work on various construction projects are analysed . The types of construction included in this study are dams, bridge, underground power - ho use a nd high - rise building. Comparisons of the results has shown that the continuous placement method yield the better output in placing of large amounts of concrete, especially for massive reinforced concrete structures. However, this method is still not widely accepted in many construction projects. It is recommended that further study be conducted on the possibility of using this method specifically for dams, underground and under water structures as well as mass foundations. Finally, a proposed planning mode land some relevant check lists are given as to provide construction planning for the placing of large quantities of concrete more meaningful .
There are no comments on this title.

AI Search