Contractual scope management of international agencies' funded projects in Afghanistan

By: Call Number: AIT Thesis no.CM-15-07 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. CM-15-07Publication details: Pathum Thani : Asian Institute of Technology, 2015Description: 1 online resource (207 p.) : illSubject(s): Online resources: Dissertation note: Thesis (M. Eng.) - Asian Institute of Technology, 2015 Summary: This study is conductedon contractual scope management practices of international agencies in Afghanistan. This study discusses that how the scope of a project canbe managed through using different types of contract considering scope completeness and associated uncertainties. Therefore the major components which are discussed in this research are;1-Scope completeness. 2-Scope pricing.3-Negotiation. In scope completeness scenario it is discussed that scope of a project can be categorized into three parts; a) Complete part, which all contract documents are completed. b) Incomplete part, where the quantity of the work to be undertaken is not cleared at the tendering stage of the project. c) Incomplete part, where the specification or method statement of the work is not cleared.Scope pricing methods are discussed and stated that based on the above three scope completeness scenarios the following three types of the contract can be used; a) Lump Sum for the complete part or scope. b) Re-measurement contract for the scope or part of it where the quantity of the work is not confirmed. c) Provisional Sumcan be used for the part of scope where latent conditions and foreseen works are expected. Negotiation was found as the key for smooth execution of scope management.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CM-15-07 (Browse shelf(Opens below)) 1 Available 30050120678031
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.CM-15-07 (Browse shelf(Opens below)) 2 Available 30050120678023
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.CM-15-07 (Browse shelf(Opens below)) 1 Available 30050120398762
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.CM-15-07 (Browse shelf(Opens below)) 3 Available 30050120849889
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.CM-15-07 (Browse shelf(Opens below)) 4 Available 30050120849855

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction, Engineering and Infrastructure Management, School of Engineering and Technology

Thesis (M. Eng.) - Asian Institute of Technology, 2015

This study is conductedon contractual scope management practices of international agencies in Afghanistan. This study discusses that how the scope of a project canbe managed through using different types of contract considering scope completeness and associated uncertainties. Therefore the major components which are discussed in this research are;1-Scope completeness. 2-Scope pricing.3-Negotiation. In scope completeness scenario it is discussed that scope of a project can be categorized into three parts; a) Complete part, which all contract documents are completed. b) Incomplete part, where the quantity of the work to be undertaken is not cleared at the tendering stage of the project. c) Incomplete part, where the specification or method statement of the work is not cleared.Scope pricing methods are discussed and stated that based on the above three scope completeness scenarios the following three types of the contract can be used; a) Lump Sum for the complete part or scope. b) Re-measurement contract for the scope or part of it where the quantity of the work is not confirmed. c) Provisional Sumcan be used for the part of scope where latent conditions and foreseen works are expected. Negotiation was found as the key for smooth execution of scope management.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!