An AGE-dependent selective maintenance policy

By: Call Number: AIT Thesis no.ISE-08-24 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. ISE-08-24Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2008Description: 132 p. : illSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2008 Summary: This thesis studies the selective maintenance policy based on the ages of the components in the system. After a fixed operation time period, the system will be maintained in a short period before the next operation cycle. In the fixed maintenance period, the replacement with identical item, the replacement with upgraded item, the rehabilitation or doing nothing actions will be chosen for each component of the system. In operation period, if the machines fail, they will be minimally repaired immediately to restore the working condition. The mathematical models are proposed to maximize the availability and the reliability of the system under the constraints of maintenance time and budget. The models are developed for the serial system, the parallel system and the serial-parallel system. The illustrating examples of the availability-maximization models are solved by using Lingo program and compared with the results coming from @Risk Optimizer program. The numerical examples of reliability-maximization models are solved by using @Risk Optimizer program. This research also extends the study on the multi-cycle selective maintenance policy with the maximin model and cost-minimization model. In these models, the system is considered in a planning horizon with a predefined number of cycles and the budget is set for all cycles. The numerical examples are also investigated by using @Risk Optimizer program.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ISE-08-24 (Browse shelf(Opens below)) 1 Available 30050120701098
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ISE-08-24 (Browse shelf(Opens below)) 2 Available 30050120701080
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ISE-08-24 (Browse shelf(Opens below)) 1 Available 30050160030762

Submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Industrial Engineering and Management, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 2008

This thesis studies the selective maintenance policy based on the ages of the components in the system. After a fixed operation time period, the system will be maintained in a short period before the next operation cycle. In the fixed maintenance period, the replacement with identical item, the replacement with upgraded item, the rehabilitation or doing nothing actions will be chosen for each component of the system. In operation period, if the machines fail, they will be minimally repaired immediately to restore the working condition. The mathematical models are proposed to maximize the availability and the reliability of the system under the constraints of maintenance time and budget. The models are developed for the serial system, the parallel system and the serial-parallel system. The illustrating examples of the availability-maximization models are solved by using Lingo program and compared with the results coming from @Risk Optimizer program. The numerical examples of reliability-maximization models are solved by using @Risk Optimizer program. This research also extends the study on the multi-cycle selective maintenance policy with the maximin model and cost-minimization model. In these models, the system is considered in a planning horizon with a predefined number of cycles and the budget is set for all cycles. The numerical examples are also investigated by using @Risk Optimizer program.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!