Economic considerations of the introduction of nuclear power in Thailand
Call Number: AIT RSPR no. ET-86-5 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. ET-86-5Publication details: Bangkok : Asian Institute of Technology, 1986Description: 56 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1986 Summary: Exploitation of energy sources for generating electricity should be studies and performed carefully. In this paper, a tec hni c to reduce the initial cost of electricity generation and the suitable si z e of nuclear power plant are studies. The revenue requirement is applied in the study by taking into account of some economic assumtions. The result obtained will be a trend for planning the nuclear energy for electricity generating for Thailand in the future. From the study, By determining the cost of power plant at 1 200 MW. It can be found that, the costs of nuclear power plant i s cheaper about 30 % than the coal-fired plant. The plant should be separated into small size, for instance , 4x300 MW, to get more reliability.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. ET-86-5 (Browse shelf(Opens below)) | 3 | Available | 30050120614978 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no. ET-86-5 (Browse shelf(Opens below)) | Available | 30050160016340 |
A research study (7 credits) submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1986
Exploitation of energy sources for generating electricity should be studies and performed carefully. In this paper, a tec hni c to reduce the initial cost of electricity generation and the suitable si z e of nuclear power plant are studies. The revenue requirement is applied in the study by taking into account of some economic assumtions. The result obtained will be a trend for planning the nuclear energy for electricity generating for Thailand in the future. From the study, By determining the cost of power plant at 1 200 MW. It can be found that, the costs of nuclear power plant i s cheaper about 30 % than the coal-fired plant. The plant should be separated into small size, for instance , 4x300 MW, to get more reliability.
There are no comments on this title.

AI Search