Evaluation and improvement of a project control structure : case of a matrix organization form in a GMS project

By: Call Number: AIT Thesis no. ISE-02-06 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. ISE-02-06Publication details: Bangkok : Asian Institute of Technology, 2002Description: 44, 17 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2002 Summary: Project are one-time jobs that have pre-defined starting and ending dates, a clearly specified objective or scope of work to be performed, a pre-defined budget, and usually a temporary organization that is dismantled once the project is complete. An important problem for those kinds of organizations is to reach, even for a short period, a good efficiency in being supported by a performance control structure: accurate and useful monitoring and reporting tools as well as a fast and accurate loop of information. This is even more true for a telecommunication project which is the case treat in this thesis: the really short time allowed to proceed after contract negotiation compare to the scope of work does not offer the necessary time to optimize the temporary organization. Then, it will be possible to compare the performance of different solutions for an organization by analyzing the starting organization of a project, by sorting the needs and by developing a tool for simulating the speed in the loop of information for different proposed organization. This proposed tool might be used to improve the monitoring and control of a project in the future.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ISE-02-06 (Browse shelf(Opens below)) 1 Available 30050120805675
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ISE-02-06 (Browse shelf(Opens below)) 2 Available 30050120805683
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ISE-02-06 (Browse shelf(Opens below)) 1 Available 30050120241533

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies

Thesis (M.Eng.) - Asian Institute of Technology, 2002

Project are one-time jobs that have pre-defined starting and ending dates, a clearly specified objective or scope of work to be performed, a pre-defined budget, and usually a temporary organization that is dismantled once the project is complete. An important problem for those kinds of organizations is to reach, even for a short period, a good efficiency in being supported by a performance control structure: accurate and useful monitoring and reporting tools as well as a fast and accurate loop of information. This is even more true for a telecommunication project which is the case treat in this thesis: the really short time allowed to proceed after contract negotiation compare to the scope of work does not offer the necessary time to optimize the temporary organization. Then, it will be possible to compare the performance of different solutions for an organization by analyzing the starting organization of a project, by sorting the needs and by developing a tool for simulating the speed in the loop of information for different proposed organization. This proposed tool might be used to improve the monitoring and control of a project in the future.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!