Evaluation of small scale water resources development in Bangladesh : a case study of an embankment project in the Haor area

By: Call Number: AIT RSPR no. IR-93-01 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IR-93-01Publication details: Bangkok : Asian Institute of Technology, 1994Description: 75 leavesSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1993 Summary: To evaluate the "Haizda Embankment Project" contribution, overall condition of the farmers (within the project area) what was before the project construction as well as the present situation were considered. Expected outcome from the project implementation was also considered in this regard. The findings of this study are, due to the project construction farmers are giving more attention for Boro cultivation as well as use of HYV seeds, use of fertilizer, use of insecticide, labor employment and farmers yearly income significantly increased. On the other hand, crop damages through early flood, insufficient irrigation water and drainage congestion significantly decreased. Overall water management situation and transportation facilities are increased within the project area except there are little adverse effect on fish production within the project area and water management situation outside the project area somewhat interrupted through the construction of embankment. Except little adverse effect, the project has several fruitful impacts on the project area but not at the expected level. The causes behind it may be as : firstly, the project was constructed only two years before and secondly, some of the essential components of the project not yet been installed. Finally, it is seem that the partial flood control projects are more suitable rather than the full control or polder type of projects in the Haor areas of Bangladesh.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. IR-93-01 (Browse shelf(Opens below)) 1 Available 30050003111837
40-Archives Asian Institute of Technology Library Archives AIT RSPR no. IR-93-01 (Browse shelf(Opens below)) 1 Available 30050160106984

A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development

Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1993

To evaluate the "Haizda Embankment Project" contribution, overall condition of the farmers (within the project area) what was before the project construction as well as the present situation were considered. Expected outcome from the project implementation was also considered in this regard. The findings of this study are, due to the project construction farmers are giving more attention for Boro cultivation as well as use of HYV seeds, use of fertilizer, use of insecticide, labor employment and farmers yearly income significantly increased. On the other hand, crop damages through early flood, insufficient irrigation water and drainage congestion significantly decreased. Overall water management situation and transportation facilities are increased within the project area except there are little adverse effect on fish production within the project area and water management situation outside the project area somewhat interrupted through the construction of embankment. Except little adverse effect, the project has several fruitful impacts on the project area but not at the expected level. The causes behind it may be as : firstly, the project was constructed only two years before and secondly, some of the essential components of the project not yet been installed. Finally, it is seem that the partial flood control projects are more suitable rather than the full control or polder type of projects in the Haor areas of Bangladesh.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!