Analysis and evaluation of fixed jacket installation delays
Call Number: AIT Thesis no.OTM-15-05 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. OTM-15-05Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2015Description: 52 leaves : ill. (some col.)Subject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2015 Summary: The objective of this study is to propose a systematic approach about analyzing and evaluation of delay on offshore installation of Jacket.This study incorporates with statistics of past projects data and viewing the report documents into identifying the causes of delay of installation of jacket to predict the probability of delay and delay hours. Once causes of delay are identified, data collection would be the first step to be done to decide the best fitted continuous distribution based on how much data available which will be used as input variables in probabilistic-based model. Then, the Monte Carlo simulation would be used to predict theprobability of output, in other words, to predict the probability of occurring delay and delay hours in installation of jacket. After that, the practical response plan regarding delay would be decided in term of different options. Finally, this study would end up with the comparison of money loss caused by delay and implementation cost to prepare according response plan. The proposed systematical procedure above was applied to installation of 4-legs jacket installation as a case study of this paper.The result of this study can be applied for both in project planning and strategic decision making to prevent the liquidate damage or penalty in bidding stage. Finally, the case study shows that the proposed procedure could be used as a powerful tool to reduce or deal with delay and it could be a very helpful information for decision maker.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.OTM-15-05 (Browse shelf(Opens below)) | 1 | Available | 30050120326409 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.OTM-15-05 (Browse shelf(Opens below)) | 2 | Available | 30050120326201 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.OTM-15-05 (Browse shelf(Opens below)) | 1 | Available | 30050120401343 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering inOffshore Technology and Management, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 2015
The objective of this study is to propose a systematic approach about analyzing and evaluation of delay on offshore installation of Jacket.This study incorporates with statistics of past projects data and viewing the report documents into identifying the causes of delay of installation of jacket to predict the probability of delay and delay hours. Once causes of delay are identified, data collection would be the first step to be done to decide the best fitted continuous distribution based on how much data available which will be used as input variables in probabilistic-based model. Then, the Monte Carlo simulation would be used to predict theprobability of output, in other words, to predict the probability of occurring delay and delay hours in installation of jacket. After that, the practical response plan regarding delay would be decided in term of different options. Finally, this study would end up with the comparison of money loss caused by delay and implementation cost to prepare according response plan. The proposed systematical procedure above was applied to installation of 4-legs jacket installation as a case study of this paper.The result of this study can be applied for both in project planning and strategic decision making to prevent the liquidate damage or penalty in bidding stage. Finally, the case study shows that the proposed procedure could be used as a powerful tool to reduce or deal with delay and it could be a very helpful information for decision maker.
There are no comments on this title.

AI Search