Geotechnical aspects in design and construction of Bangkok MRTA blue line initial system
Call Number: AIT Thesis no. GE-98-03 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. GE-98-03Publication details: Bangkok : Asian Institute of Technology, 1999Description: 260 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1999 Summary: This research reviewed geotechnical aspects of underground works related to tunnelling and station construction of the Initial System MRT Project. Properties of subsoil through the tunnel alignment were summarized. Top-down method is performed in station construction. Station walls used diaphragm wall to support the surrounding soils. In tunnel works, eight EPB shields are adopted for excavation of the running tunnels. Tunnel lining consists of five and six regular precast concrete segments. The design method of segmental lining is of the Muir Wood (1975). Consolidation of the clay layer causes differential settlement of the underground structures founded on different foundation depths. The settlement prediction methods are based on the regression of land subsidence data and the consolidation compression/swelling characteristics of the clays. This research summarizes the results of differential settlement prediction that is expected between tunnel connections with other structures founded at a shallower or deeper depth. The evaluation of protection requirement followed damage classification given by Burland ( 1997) and Boscadin and Cording (1989). Pile foundations of canal bridge and overpass bridge obstructing the routes of bored tunnels, are underpinned with new piles. Ground treatment utilized in construction mainly consists of jet grouting in order to control the problems of soft ground.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. GE-98-03 (Browse shelf(Opens below)) | 1 | Available | 30050120717482 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. GE-98-03 (Browse shelf(Opens below)) | 2 | Available | 30050120717466 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. GE-98-03 (Browse shelf(Opens below)) | 1 | Available | 30050160081252 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering
Thesis (M.Eng.) - Asian Institute of Technology, 1999
This research reviewed geotechnical aspects of underground works related to tunnelling and station construction of the Initial System MRT Project. Properties of subsoil through the tunnel alignment were summarized. Top-down method is performed in station construction. Station walls used diaphragm wall to support the surrounding soils. In tunnel works, eight EPB shields are adopted for excavation of the running tunnels. Tunnel lining consists of five and six regular precast concrete segments. The design method of segmental lining is of the Muir Wood (1975). Consolidation of the clay layer causes differential settlement of the underground structures founded on different foundation depths. The settlement prediction methods are based on the regression of land subsidence data and the consolidation compression/swelling characteristics of the clays. This research summarizes the results of differential settlement prediction that is expected between tunnel connections with other structures founded at a shallower or deeper depth. The evaluation of protection requirement followed damage classification given by Burland ( 1997) and Boscadin and Cording (1989). Pile foundations of canal bridge and overpass bridge obstructing the routes of bored tunnels, are underpinned with new piles. Ground treatment utilized in construction mainly consists of jet grouting in order to control the problems of soft ground.