Geotechnical problems associated with the construction of RTN dockyard, Pom Prachul

By: Call Number: AIT Thesis no.GT-79-19 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. GT-79-19Publication details: Bangkok : Asian Institute of Technology, 1980Description: 165 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1980 Summary: Royal Thai Navy Dockyard is currently underconstruction at Pom Prachul. This thesis is a case study of this project concerned mainly with the geotechnical aspects. The object was to monitor all the activities, ranging from design to execution, which have been carried out in this project related to geotechnical engineering. The general construction sequence and the techniques employed in the installation of foundation and retaining structures have been presented along with a discussion. Moreover, problems encountered in the installation of foundations (owing to soft nature of Pom Prachul Clay) and the manner in which they were tackled have been dealt in detail. A probe was made into the problem of lateral displacement of piles and measures have been suggested to reduce the magnitude of this problem. Strut loads measured by means of electrical resistance strain gages in a dry dock excavation have also been presented.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.GT-79-19 (Browse shelf(Opens below)) 3 Available 30050120738405
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.GT-79-19 (Browse shelf(Opens below)) 1 Available 30050160071006

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1980

Royal Thai Navy Dockyard is currently underconstruction at Pom Prachul. This thesis is a case study of this project concerned mainly with the geotechnical aspects. The object was to monitor all the activities, ranging from design to execution, which have been carried out in this project related to geotechnical engineering. The general construction sequence and the techniques employed in the installation of foundation and retaining structures have been presented along with a discussion. Moreover, problems encountered in the installation of foundations (owing to soft nature of Pom Prachul Clay) and the manner in which they were tackled have been dealt in detail. A probe was made into the problem of lateral displacement of piles and measures have been suggested to reduce the magnitude of this problem. Strut loads measured by means of electrical resistance strain gages in a dry dock excavation have also been presented.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!