Analyzing the logistic process for pre-engineering building (P.E.B) construction
Call Number: AIT Proj. no.CM-09-12 Material type:
SeriesSeries: Asian Institute of Technology. Project ; no. CM-09-12Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009Description: 51 leaves : illSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2009 Summary: Erection is the last important stage of P.E.B product life cycle, to complete success this stage, it is requested the fulfillment of previous stages as the erection logistic stage. However, in the real erection job sites, especially the job sites in Vietnam, there a lot of problems happened in this stage that make erection stage can not be completed as expected, by analyzing to find out the root causes of these problems from the data, which are investigated from a real P.E.B company, base on key relevant theories, the Author would like to develop the solutions for future improvements.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) | 1 | Available | 30050120688238 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) | 2 | Available | 30050120742829 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) | Available | 30050120232573 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction Engineering and Infrastructure Management
Project (M. Eng.) - Asian Institute of Technology, 2009
Erection is the last important stage of P.E.B product life cycle, to complete success this stage, it is requested the fulfillment of previous stages as the erection logistic stage. However, in the real erection job sites, especially the job sites in Vietnam, there a lot of problems happened in this stage that make erection stage can not be completed as expected, by analyzing to find out the root causes of these problems from the data, which are investigated from a real P.E.B company, base on key relevant theories, the Author would like to develop the solutions for future improvements.