An integrated project management control system

By: Call Number: AIT Thesis no.ST-85-33 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-85-33Publication details: Bangkok : Asian Institute of Technology, 1985Description: 179 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1985 Summary: In this study, the construction management tasks of project planning, scheduling, and controlling are discussed. A BASIC Micro-Computer program group for project schedule and control is also developed. Attention is concentrated on the project control system, based upon the Critical Path Method (activity of arrow) as the research topic. Data and relevant information of a building construction project were collected. The proposed integrated project management program is tested, and proves to be a very useful method for project management.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-85-33 (Browse shelf(Opens below)) 3 Available 30050120687396
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-85-33 (Browse shelf(Opens below)) 1 Available 30050160012364

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1985

In this study, the construction management tasks of project planning, scheduling, and controlling are discussed. A BASIC Micro-Computer program group for project schedule and control is also developed. Attention is concentrated on the project control system, based upon the Critical Path Method (activity of arrow) as the research topic. Data and relevant information of a building construction project were collected. The proposed integrated project management program is tested, and proves to be a very useful method for project management.