An application of a microcomputer to construction
Call Number: AIT Thesis no. ST-80-21 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-80-21Publication details: Bangkok : Asian Institute of Technology, 1980Description: 116 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1980 Summary: Aid of a microcomputer to a construction project manager for project planning and scheduling is investigated. A microcomputer system model of project scheduling and updating is developed. The model consists of many modular programs which are used for network computation, resource requirement scheduling, cash flow analysis, and purchasing scheduling. A sample project is illustrated to show input and output of the model. A comparison of results of the sample project scheduling and updating by a microcomputer with those by a manual procedure is made, and shows that project scheduling and updating by a microcomputer is quicker, easier, and more economical.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-80-21 (Browse shelf(Opens below)) | 1 | Available | 30050160062005 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1980
Aid of a microcomputer to a construction project manager for project planning and scheduling is investigated. A microcomputer system model of project scheduling and updating is developed. The model consists of many modular programs which are used for network computation, resource requirement scheduling, cash flow analysis, and purchasing scheduling. A sample project is illustrated to show input and output of the model. A comparison of results of the sample project scheduling and updating by a microcomputer with those by a manual procedure is made, and shows that project scheduling and updating by a microcomputer is quicker, easier, and more economical.