Application of material requirements planning in a workshop of construction company

By: Call Number: AIT RSPR no. IE-85-10 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IE-85-10Publication details: Bangkok : Asian Institute of Technology, 1985Description: 42, I-1 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 Summary: The material requirements planning system is used extensively with planned production. It is suitable for items which have a derived demand. For items that are materials or components used for end items, stock levels are derived from the requirements dictated by end item. It is a derived order quantity system. A workshop of construction company is responsible to maintain the regular operation of the equipment . The preventive maintenance of equipment required amount of various parts. The shortage of parts caused the shutdown of the equipment, excessive inventory incurred more carrying cost. So the MRP system was considered to solve the problem. The study deals with the adaption and implementation of the MRP model to the maintenance job of the workshop . Data from the part requirements of 5 models of equipment, each with 4 types of maintenance were analyzed. A new lot sizing technique was developed for more efficient to saving the computation. The results indicated that the MRP approach could help in solving the problems.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. IE-85-10 (Browse shelf(Opens below)) 1 Available 30050003110532
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. IE-85-10 (Browse shelf(Opens below)) 2 Available 30050120724389
20-AIT Publication Asian Institute of Technology Library Archives AIT RSPR no. IE-85-10 (Browse shelf(Opens below)) 3 Available 30050003110516
20-AIT Publication Asian Institute of Technology Library Archives AIT RSPR no. IE-85-10 (Browse shelf(Opens below)) 4 Available 30050003110508
40-Archives Asian Institute of Technology Library Archives AIT RSPR no. IE-85-10 (Browse shelf(Opens below)) Available 30050160109798

A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985

The material requirements planning system is used extensively with planned production. It is suitable for items which have a derived demand. For items that are materials or components used for end items, stock levels are derived from the requirements dictated by end item. It is a derived order quantity system. A workshop of construction company is responsible to maintain the regular operation of the equipment . The preventive maintenance of equipment required amount of various parts. The shortage of parts caused the shutdown of the equipment, excessive inventory incurred more carrying cost. So the MRP system was considered to solve the problem. The study deals with the adaption and implementation of the MRP model to the maintenance job of the workshop . Data from the part requirements of 5 models of equipment, each with 4 types of maintenance were analyzed. A new lot sizing technique was developed for more efficient to saving the computation. The results indicated that the MRP approach could help in solving the problems.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!