Application of system dynamics concepts to the management of high rise construction projects

By: Call Number: AIT Thesis no.ST-92-06 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-92-06Publication details: Bangkok : Asian Institute of Technology, 1992Description: 111 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1992 Summary: The selected System Dynamics Construction Management Model was developed by Chang, Chui-Lung (AIT, 1990) which is a review of the R & D Project Model published by George Richardson and Alexander L. Pugh III (1981). System Dynamics Model was used in this study since a complex system comprising a number of v<ufables, non-linear, feedback and data deficiency were considered. In the booming construction · industry, the noticeable occurrence of the Time and Cost overruns has been a striking feature in many high-rise construction projects. The purpose of this study is to investigate, through system dynamics simulation, the behavior of possible ovenuns in the high rise construction projects. And from the different policy alternatives to improve the behaviors of selected project, at the same time, to verify the feasibility of the wisely developed System Dynamics Construction Model. The test data were collected from two high-rise building projects in Bangkok, Thailand. The simulated result, both projects have the behavior of time overrun and one View project also has the behavior of cost overrun. The model based policy sensitivity analyses are introduced, such as increasing fraction of experienced (with new hiring workforce policy), increasing the input of investment equipment and equipment lay off planning. As a consequence, an improved construction project model is established, at the same time minimizing the possibility of project time and cost overruns. The modified model not only could be used for the policy analysis to improve project performance but also could be the reference for training engineers and managers on sites.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-92-06 (Browse shelf(Opens below)) 1 Available 30050003065603
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-92-06 (Browse shelf(Opens below)) 2 Available 30050003065611
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-92-06 (Browse shelf(Opens below)) 1 Available 30050160022371

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1992

The selected System Dynamics Construction Management Model was developed by Chang, Chui-Lung (AIT, 1990) which is a review of the R & D Project Model published by George Richardson and Alexander L. Pugh III (1981). System Dynamics Model was used in this study since a complex system comprising a number of v<ufables, non-linear, feedback and data deficiency were considered. In the booming construction · industry, the noticeable occurrence of the Time and Cost overruns has been a striking feature in many high-rise construction projects. The purpose of this study is to investigate, through system dynamics simulation, the behavior of possible ovenuns in the high rise construction projects. And from the different policy alternatives to improve the behaviors of selected project, at the same time, to verify the feasibility of the wisely developed System Dynamics Construction Model. The test data were collected from two high-rise building projects in Bangkok, Thailand. The simulated result, both projects have the behavior of time overrun and one View project also has the behavior of cost overrun. The model based policy sensitivity analyses are introduced, such as increasing fraction of experienced (with new hiring workforce policy), increasing the input of investment equipment and equipment lay off planning. As a consequence, an improved construction project model is established, at the same time minimizing the possibility of project time and cost overruns. The modified model not only could be used for the policy analysis to improve project performance but also could be the reference for training engineers and managers on sites.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!