Logistics for the construction of transmission systems
Call Number: AIT RSPR no. IE-85-16 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IE-85-16Publication details: Bangkok : Asian Institute of Technology, 1985Description: 38, M-2 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 Summary: This research deals with a transportation problem of material parts in the field of construction of transmission systems, with particular reference to the Transmission and Distribution Con struction (TDC) office of Taiwan Power Company (Taipower) . The problem · could be identified as a large "capacitated plant location problem". However, it was solved by a hierarchical ap proach, i.e., first, the parts allocation to each warehouse is deterimined by a mixed integer linear programming model; second, the minimum number of trucks and the specific load of each truck for each warehouse are determined by set covering model . A heuristic method and exact method for the set covering problem were studied, and it- was found that the heuristic method performed satisfactorily in this context. A case study of a transmission line construction project was made, showing the usefulness of the overall approach.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-85-16 (Browse shelf(Opens below)) | 1 | Available | 30050003110649 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-85-16 (Browse shelf(Opens below)) | 2 | Available | 30050003110656 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no. IE-85-16 (Browse shelf(Opens below)) | Available | 30050160109731 |
A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985
This research deals with a transportation problem of material parts in the field of construction of transmission systems, with particular reference to the Transmission and Distribution Con struction (TDC) office of Taiwan Power Company (Taipower) . The problem · could be identified as a large "capacitated plant location problem". However, it was solved by a hierarchical ap proach, i.e., first, the parts allocation to each warehouse is deterimined by a mixed integer linear programming model; second, the minimum number of trucks and the specific load of each truck for each warehouse are determined by set covering model . A heuristic method and exact method for the set covering problem were studied, and it- was found that the heuristic method performed satisfactorily in this context. A case study of a transmission line construction project was made, showing the usefulness of the overall approach.
There are no comments on this title.

AI Search