Marginal costs of electricity supply in a predominantly hydro power system : case of Nepal

By: Call Number: AIT Thesis no. ET-90-13 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ET-90-13Publication details: Bangkok : Asian Institute of Technology, 1990Description: 115 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1990 Summary: This study calculates marginal costs of electricity supply. Mixed integer programming model has been used in the expansion planning analysis. Seasonal marginal capacity and energy costs at generation and various voltage levels of transmission and distribution have been calculated . For the calculation of the marginal energy cost at generation level a linear programmine simulation model has been used. Th e long-run mareinal capacity costs have been calculated as the average incremental cost of the plant. These are the strict margi.nal costs of supply without consumer related costs. Th e marginal capac.lty costs for all voltage levels at peak periods are found to be significantly higher than the capacity charges in the existine rates. But the energy charge in the existing rate structure is higher t h an the average marginal energy costs.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) 1 Available 30050003105524
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) 2 Available 30050003105516
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) Available 30050120344329

A thesis submitted in partial fulfillment of the requirements of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1990

This study calculates marginal costs of electricity supply. Mixed integer programming model has been used in the expansion planning analysis. Seasonal marginal capacity and energy costs at generation and various voltage levels of transmission and distribution have been calculated . For the calculation of the marginal energy cost at generation level a linear programmine simulation model has been used. Th e long-run mareinal capacity costs have been calculated as the average incremental cost of the plant. These are the strict margi.nal costs of supply without consumer related costs. Th e marginal capac.lty costs for all voltage levels at peak periods are found to be significantly higher than the capacity charges in the existine rates. But the energy charge in the existing rate structure is higher t h an the average marginal energy costs.