Material requirements planning and Kanban systems: analysis, planning and implementation
Call Number: AIT RSPR no. IE-83-4 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IE-83-4Publication details: Bangkok : Asian Institute of Technology, 1983Description: vi, 113 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1983 Summary: This study is concerned with the analysis, planning and implementation of MRP and Kanban systems. Both the systems have been extensively studied based on the experiences of researchers and practioners as reported in the available literatures. A comparison of the two system indicates that the MRP system is an excellent planning technique where as the Kanban system itself is a controlling device. Therefore in a production process if we use MRP for planning and Kanban for shop-floor control probably it would end up with much better result. A plant visit to an assembly production unit was made to gather some information related to the real life experiences.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-83-4 (Browse shelf(Opens below)) | 1 | Available | 30050002891215 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-83-4 (Browse shelf(Opens below)) | 2 | Available | 30050003128138 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no. IE-83-4 (Browse shelf(Opens below)) | 1 | Available | 30050160110267 |
A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1983
This study is concerned with the analysis, planning and implementation of MRP and Kanban systems. Both the systems have been extensively studied based on the experiences of researchers and practioners as reported in the available literatures. A comparison of the two system indicates that the MRP system is an excellent planning technique where as the Kanban system itself is a controlling device. Therefore in a production process if we use MRP for planning and Kanban for shop-floor control probably it would end up with much better result. A plant visit to an assembly production unit was made to gather some information related to the real life experiences.
There are no comments on this title.

AI Search