Microcomputer aid to the information system in construction management

By: Call Number: AIT Thesis no. ST-85-30 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-85-30Publication details: Bangkok : Asian Institute of Technology, 1985Description: 171 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1985 Summary: This study discusses the application of a microcomputer as a tool for processing the information needed in construction management. Applications of using a microcomputer are illustrated in the areas of: Work Schedule & Updating; Quantity Take Off ; Status of Project (Progress Measurement) ; Work Evaluation; Resource Schedule; Resource Commitment Record; Cash Flow Analysis; Payment Certificate; cost Report; and Quality Control (Test Record).
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ST-85-30 (Browse shelf(Opens below)) 1 Available 30050003062071
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ST-85-30 (Browse shelf(Opens below)) 2 Available 30050003062089
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ST-85-30 (Browse shelf(Opens below)) 1 Available 30050160012406

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1985

This study discusses the application of a microcomputer as a tool for processing the information needed in construction management. Applications of using a microcomputer are illustrated in the areas of: Work Schedule & Updating; Quantity Take Off ; Status of Project (Progress Measurement) ; Work Evaluation; Resource Schedule; Resource Commitment Record; Cash Flow Analysis; Payment Certificate; cost Report; and Quality Control (Test Record).

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!