Optimal hydropower development in Choshui river basin
Call Number: AIT Thesis no. WA-85-26 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. WA-85-26Publication details: Bangkok : Asian Institute of Technology, 1984Description: 53, [40] pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1984 Summary: The Choshui river basin planning in ROC-Taiwan for power generation and irrigation has been approached through linear programming. The separable programming capability of MPSX/370 is fully taken advantage of to incorporate the nonlinearities inherent in the cost functions of dams, tunnels, surgetank, forebay, penstock and powerhouse. The nonlinear relation of effective head versus storage content of reservoirs and incorporated through an iterative procedure. The system consists of 2 reservoirs, one diversion, 3 powerhouse existing and 20 diversions, 2 tail race reservoirs, 19 tunnels, 9 powerhouses and 2 pumped storage facilities proposed. It is not possible to consider the problem in one formulation as the number of variables are extremely large. A suitable scheme to divide the system into subsystems and to combine them into a single system is attempted.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. WA-85-26 (Browse shelf(Opens below)) | 1 | Available | 30050003051249 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. WA-85-26 (Browse shelf(Opens below)) | 2 | Available | 30050003051264 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. WA-85-26 (Browse shelf(Opens below)) | Available | 30050160035373 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1984
The Choshui river basin planning in ROC-Taiwan for power generation and irrigation has been approached through linear programming. The separable programming capability of MPSX/370 is fully taken advantage of to incorporate the nonlinearities inherent in the cost functions of dams, tunnels, surgetank, forebay, penstock and powerhouse. The nonlinear relation of effective head versus storage content of reservoirs and incorporated through an iterative procedure. The system consists of 2 reservoirs, one diversion, 3 powerhouse existing and 20 diversions, 2 tail race reservoirs, 19 tunnels, 9 powerhouses and 2 pumped storage facilities proposed. It is not possible to consider the problem in one formulation as the number of variables are extremely large. A suitable scheme to divide the system into subsystems and to combine them into a single system is attempted.
There are no comments on this title.

AI Search