A pre-feasibility study of an integrated wind-hydro electric scheme in Sri Lanka

By: Call Number: AIT Thesis no. ET-82-7 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ET-82-7Publication details: Bangkok : Asian Institute of Technology, 1982Description: iv, 87 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1982 Summary: The integration of the planned 14.S MW hydro power scheme at Taldena near Badulla and a proposed wind power scheme. on the coast near Hambantota in which large wind generators supply electric power to the grid for consumption around Hambantota has been studied by monthly simulation of the reservoir level and total electrical power output with the help of historical hydrological and wind speed data. The proposed wind power scheme consists of one, two or three 2.5 MW wind generators whose function is to save reservoir water during windy periods occurring in the dry season. Assuming a payback period of 20 years for the wind generators it has been found that increasing the number of wind generators greatly reduces the cost of the electricity produced, which is expected to fall in the range 0.10 US$ per kWh to 0.03 US$ per kWh.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ET-82-7 (Browse shelf(Opens below)) 1 Available 30050003103545
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ET-82-7 (Browse shelf(Opens below)) 2 Available 30050003103552
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ET-82-7 (Browse shelf(Opens below)) Available 30050120352744

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development

Thesis (M.Eng.) - Asian Institute of Technology, 1982

The integration of the planned 14.S MW hydro power scheme at Taldena near Badulla and a proposed wind power scheme. on the coast near Hambantota in which large wind generators supply electric power to the grid for consumption around Hambantota has been studied by monthly simulation of the reservoir level and total electrical power output with the help of historical hydrological and wind speed data. The proposed wind power scheme consists of one, two or three 2.5 MW wind generators whose function is to save reservoir water during windy periods occurring in the dry season. Assuming a payback period of 20 years for the wind generators it has been found that increasing the number of wind generators greatly reduces the cost of the electricity produced, which is expected to fall in the range 0.10 US$ per kWh to 0.03 US$ per kWh.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!