An assessment of the planning process for rural road network development : a case study in Dong Anh district, Vietnam

By: Call Number: AIT Thesis no.AC-99-30 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. AC-99-30Publication details: Bangkok : Asian Institute of Technology, 1999Description: 109 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Sc.) - Asian Institute of Technology, 1999 Summary: This research aimed to study the planning process for rural road development in relation to the Master Plan prepared for Dong Anh District in Vietnam and the problems associated with implementation of the plan. The analysis of the planning process revealed that the planners have applied conventional planning methods to prepare the plan. There has not been involvement of beneficiaries in the planning process which means that the exercise has been top-down. Availability of reliable data has been a major limiting factor. Planners had to rely on several sources to obtain data and most of the data has been out of date. Even the topographic map is old. The National Institute for Urban and Rural Planning lacked modem data processing facilities. The road plan did not contain an implementation plan. Lack of detailed project proposals and funds has been the main constraints for implementation of the plan. The implementers relied entirely on government to provide funds and no attempt was made to mobilize local resources to implement the plan. Coordination among various agencies has been a problem. It is recommended that the data base for planning should be improved, beneficiary participation in determining the needs and priorities should be strengthened, computer facilities should be used for data analysis, GIS technique should be used for preparation of the plan, beneficiary involvement in implementation in terms of financing and monitoring should be encouraged, and other organizations such as NGOs should be allowed to participate in planning as well as implementation.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.AC-99-30 (Browse shelf(Opens below)) 1 Available 30050120583876
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.AC-99-30 (Browse shelf(Opens below)) 2 Available 30050120583884
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.AC-99-30 (Browse shelf(Opens below)) 1 Available 30050160053806

A thesis submitted in partial fulfilment of the requirements for the degree of Master of Science, · School of Environment, Resources and Development

Thesis (M.Sc.) - Asian Institute of Technology, 1999

This research aimed to study the planning process for rural road development in relation to the Master Plan prepared for Dong Anh District in Vietnam and the problems associated with implementation of the plan. The analysis of the planning process revealed that the planners have applied conventional planning methods to prepare the plan. There has not been involvement of beneficiaries in the planning process which means that the exercise has been top-down. Availability of reliable data has been a major limiting factor. Planners had to rely on several sources to obtain data and most of the data has been out of date. Even the topographic map is old. The National Institute for Urban and Rural Planning lacked modem data processing facilities. The road plan did not contain an implementation plan. Lack of detailed project proposals and funds has been the main constraints for implementation of the plan. The implementers relied entirely on government to provide funds and no attempt was made to mobilize local resources to implement the plan. Coordination among various agencies has been a problem. It is recommended that the data base for planning should be improved, beneficiary participation in determining the needs and priorities should be strengthened, computer facilities should be used for data analysis, GIS technique should be used for preparation of the plan, beneficiary involvement in implementation in terms of financing and monitoring should be encouraged, and other organizations such as NGOs should be allowed to participate in planning as well as implementation.