Aggregate production planning using goal programming
Ghafoor, Abdul
Aggregate production planning using goal programming - Bangkok : Asian Institute of Technology, 1982 - 1 v. (various pagings) - Special studies project report ; no. IE-82-17 . - Asian Institute of Technology. Special studies project report ; no. IE-82-17 .
A special study submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982
This study presents a Goal Programming model of production planning and scheduling in multiproduct, multiperiod and multistage production system. An important point in multistage production system is that workforce of all stages can not be combined together in order to find out optimal production and work force levels. So stages has been divided into two types. (1)Those whose workforce is transferable to other stages and (2) those whose workforce is non-transferable to other stages because these stages require specialized knowledge and skill. Like many other real life problems, production planning also involves multiple conflicting objectives. Unlike other models, these objectives have been considered individually and for this purpose Goal Programming approach is used. A hypothetical example is solved to test the model. Problems encountered in solving the problem by computer programs are discussed. Sensitivity analysis is performed by various arrangements of the goal priority levels.
Production planning
Aggregate production planning using goal programming - Bangkok : Asian Institute of Technology, 1982 - 1 v. (various pagings) - Special studies project report ; no. IE-82-17 . - Asian Institute of Technology. Special studies project report ; no. IE-82-17 .
A special study submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982
This study presents a Goal Programming model of production planning and scheduling in multiproduct, multiperiod and multistage production system. An important point in multistage production system is that workforce of all stages can not be combined together in order to find out optimal production and work force levels. So stages has been divided into two types. (1)Those whose workforce is transferable to other stages and (2) those whose workforce is non-transferable to other stages because these stages require specialized knowledge and skill. Like many other real life problems, production planning also involves multiple conflicting objectives. Unlike other models, these objectives have been considered individually and for this purpose Goal Programming approach is used. A hypothetical example is solved to test the model. Problems encountered in solving the problem by computer programs are discussed. Sensitivity analysis is performed by various arrangements of the goal priority levels.
Production planning

AI Search