Case study of a tractor assembly line and its balancing (Record no. 15423)

MARC details
000 -LEADER
fixed length control field 03226nam a2200421 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260817172248.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250398 th eng
035 ## - SYSTEM CONTROL NUMBER
System control number .b10129868
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no. 1257
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Jain, Yogesh Kumar
245 10 - TITLE STATEMENT
Title Case study of a tractor assembly line and its balancing
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1977
300 ## - PHYSICAL DESCRIPTION
Extent 74 p.
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. 1257
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology,1977
520 ## - SUMMARY, ETC.
Summary, etc. The main purpose of this study was to redesign an assembly line for Massey-Ferguson MF-165 tractor assembly plant. Existing assembly line had 17 work stations with the cycle time of 50 minutes, i.e. 3000 seconds. The study comprised of: 1. Studying the existing process in the tractor assembly plant. 2. Breaking down the process into a group of work elements, each of which is associated with. work element time and precedence requirements. 3. Applying heuristic method to improve the balancing of the tractor assembly line. The data were collected continuously on the line and were not randomized. It was assumed th.at each type of the job requires the same type and level of skill of labourers, i.e. the workers have the ability to do the 0ther jobs. Using heuristic method of assembly line balancing, the minimum number of work stations needed for this assembly line should be only 13, for a cycle time of 3000 seconds. Assuming th.at the painting time can reduced, the cycle time could be reduced to 2860 seconds. In both cases for 13 work stations the number of operators can be reduced from 38 to 32. Reduction in cycle time from 3000 seconds to 2860 seconds should increase the production slightly. A computer program written for this study way used in step 3. It can also be applied in solving similar line balancing problems.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Tractors
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Assembly-line balancing
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Singh, Gajendra,
Relator term ChairPerson
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Cowell, P. A.,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Sharif, M. N.,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Government of Canada,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. 1257
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B23433">http://203.159.5.9/ait-thesis/detail.php?q=B23433</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b10129868
b mnait
c x
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 260210
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 2
Cataloger's initials, CIN (RLIN) 951012
First date, FD (RLIN) m
-- a
-- x
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003024576
CREATED CREATED : 1994-05-16
RECORD Id RECORD # : i10146775
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003024584
CREATED CREATED : 1994-05-16
RECORD Id RECORD # : i10146787
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050160086715
CREATED CREATED : 2016-11-05
RECORD Id RECORD # : i12976027
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 17/08/2026   AIT Thesis no. 1257 30050003024576 17/08/2026 1 17/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 17/08/2026   AIT Thesis no. 1257 30050003024584 17/08/2026 2 17/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 17/08/2026   AIT Thesis no. 1257 30050160086715 17/08/2026   17/08/2026 40-Archives
คัดลอกแล้ว!