Conflict modelling and resolution : (Record no. 21972)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 04948nam a2200409 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260818084812.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 030798 th eng |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b11408820 |
| 099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
| Classification number | AIT Thesis no. IE-94-16 |
| 100 0# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Janevit Siriassakul |
| 245 10 - TITLE STATEMENT | |
| Title | Conflict modelling and resolution : |
| Remainder of title | the case of the Bangkok Mass Transit System Project |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bangkok : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 1994 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 131 leaves |
| 490 1# - SERIES STATEMENT | |
| Series statement | Thesis ; |
| Volume/sequential designation | no. IE-94-16 |
| 500 ## - GENERAL NOTE | |
| General note | A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Thesis (M.Eng.) - Asian Institute of Technology, 1994 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | A conflict is a situation in which there is a condition of opposition, and parties with opposing goals affect one another. The objective of conflict analysis is to predict the most likely resolution for the conflict. The first step in performing conflict analysis is to select a point in time. This is extremely important since a conflict is a dynamic phenomenon and its components may change over the courses of conflict. Typically, a conflict can be modeled as a hierarchical structure which consists of three main components: players; objectives; and options. In this study, a conflict of the Bangkok mass transit system is examined. Since on May 17, 1994, the cabinet had decided that all mass transit systems within an inner city area must go underground. The resolution had affected the three mass transit projects: Hopewell's; Bangkok Transit System Corporation (BTSC)'s; and Muang Thong Mass Transit (MTMT)'s projects. According to conflict of taking parts of the three projects underground, the BTSC's mass transit project is selected as a case study. The point in time to conduct conflict analysis is July 12, 1994 the date the government have to make a decision to solve the conflict. This conflict may lead to legal problems with BTSC and affect investment climate to the country. The methodology using to conduct conflict analysis consists of two methods: the conflict analysis method (Fraser and Hipel, 1979); and the AHP forward process. The conflict analysis method works well in practice and its assumptions reflect closely what happens in reality. The objective of the conflict analysis method is to predict the potential resolutions or equilibria for the conflict. However, the conflict analysis method has no clearly approach to specify which one of these equilibria be the most likely resolution. This disadvantage can be compensated by applying the AHP forward process. The AHP forward process is applied to project forward the most likely resolution to happen, given the objectives and capabilities of each player to the conflict. Therefore, the application of the conflict analysis method complimented with the AHP forward process, is perfectly to conduct conflict analysis. In addition to the conflict analysis method, the concept of Pareto optimality is applied to specify which equilibria be the non-dominated or Pareto ones, and a sensitivity analysis technique is applied to assess the possible range of the potential resolutions. For the AHP forward process, the two sensitivity analysis techniques adding with a non parametric statistics named Mann Whitney test, are applied to test for the reliability of the solution as well as its stability in future. Consequently, regarding the conflict of BTSC's mass transit project, the analysis results are closely same to the evidences happened in the real world conflict. According to all the concepts applied in this study, finally a general integrated framework for conflict analysis is introduced. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Conflict management |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Pastijn, Hugo, |
| Relator term | Chairperson |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Tabucanon, Mario T., |
| Relator term | Examination Committee |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Tang, John C.S., |
| Relator term | Examination Committee |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | The Federal Republic of Germany (DAAD), |
| Relator term | Scholarship Donor |
| 810 2# - SERIES ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology. |
| Title of a work | Thesis ; |
| Volume/sequential designation | no. IE-94-16 |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href="http://203.159.5.9/ait-thesis/detail.php?q=B15410">http://203.159.5.9/ait-thesis/detail.php?q=B15410</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b11408820 |
| b | mnait |
| c | s |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 240403 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 2 |
| Cataloger's initials, CIN (RLIN) | 951104 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | s |
| -- | 0 |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 20-AIT Publication |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 40-Archives |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050003075792 |
| CREATED | CREATED : 1995-04-11 |
| RECORD Id | RECORD # : i11652147 |
| LPATRON | LPATRON : 1018444 |
| LCHKIN | LCHKIN : 2007-09-23 |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 2 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120820724 |
| CREATED | CREATED : 1995-04-11 |
| RECORD Id | RECORD # : i11652159 |
| LPATRON | LPATRON : 1015030 |
| LCHKIN | LCHKIN : 2005-10-05 |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 6 |
| -- | TOT RENEW : 6 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050160074695 |
| CREATED | CREATED : 2016-04-22 |
| RECORD Id | RECORD # : i12951559 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | AIT Thesis no. IE-94-16 | 30050003075792 | 18/08/2026 | 1 | 18/08/2026 | 20-AIT Publication | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | AIT Thesis no. IE-94-16 | 30050120820724 | 18/08/2026 | 2 | 18/08/2026 | 20-AIT Publication | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 18/08/2026 | AIT Thesis no. IE-94-16 | 30050160074695 | 18/08/2026 | 1 | 18/08/2026 | 40-Archives |

AI Search