Contract administration procedure for World Bank funded construction projects in Afghanistan (Record no. 22870)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 03625nas a2200445 i 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260818085031.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 190613s2017 th uu m rtt 0| a1eng d |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b12312939 |
| 099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
| Classification number | AIT SSPR no.CM-17-01 |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Saljoqi, Khalid |
| 245 10 - TITLE STATEMENT | |
| Title | Contract administration procedure for World Bank funded construction projects in Afghanistan |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bangkok : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 2017 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 1 online resource (87 leaves) : |
| Other physical details | ill. |
| 490 1# - SERIES STATEMENT | |
| Series statement | Special studies project report ; |
| Volume/sequential designation | no. CM-17-01 |
| 500 ## - GENERAL NOTE | |
| General note | A research submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction, Engineering and Infrastructure Management |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Research report (M. BA.) - Asian Institute of Technology, 2017 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | Ineffective contract administration procedures plays a vital rolein typical construction problems such as extensive delays in planned schedule cost overruns, very serious problem in quality, and an increased number of claim and litigation. Due to the different culture in each country, Afghan contract administration procedures were investigated from World Bank construction projects. This study was conducted by focusing on contract administration procedures during construction phase as payment, request extension o time, submittal and approval, inspection, change order, and delay procedures.Date was included contract conditions and clauses from case study World Bankconstruction project. In addition, the supportive information was collected through personal interview. The in-depth experienced consultant was interviewed based on the data provided from the contract conditions in order to get more reliable information. The obtained data was analyzed to indentify the contract administration procedures during the construction phase in practice from World Bankby using the frequency distribution statistical analysis. Also, the strengths and weaknesses of each procedure can be determined via personal interview. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Construction projects |
| General subdivision | Management |
| Geographic subdivision | Afghanistan |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Public contracts |
| Geographic subdivision | Afghanistan |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Santoso, Djoen San, |
| Relator term | Chairperson |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Hadikusumo, Bonaventura H. W., |
| Relator term | Examination Committee |
| 700 0# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Chotchai Charoenngam, |
| Relator term | Examination Committee |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | AFG Western Basins Water Resources Management Project, |
| Relator term | Scholarship Donor |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | AIT Fellowship, |
| Relator term | Scholarship Donor |
| 810 2# - SERIES ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology. |
| Title of a work | Special studies project report ; |
| Volume/sequential designation | no. CM-17-01 |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href="http://203.159.5.9/ait-thesis/detail.php?q=B01686">http://203.159.5.9/ait-thesis/detail.php?q=B01686</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b12312939 |
| b | mnait |
| c | m |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 240422 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 0 |
| Cataloger's initials, CIN (RLIN) | 190613 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | m |
| -- | 0 |
| 962 ## - | |
| -- | 000:001:PDF:b1231293:004167:0:0:0:0:0:0 |
| -- | Click to view Abstract |
| -- | n |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 20-AIT Publication |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 40-Archives |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120960116 |
| CREATED | CREATED : 2019-06-13 |
| RECORD Id | RECORD # : i13192796 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120960082 |
| CREATED | CREATED : 2019-06-13 |
| RECORD Id | RECORD # : i13192802 |
| LPATRON | LPATRON : 1031873 |
| LCHKIN | LCHKIN : 2023-01-15 |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 1 |
| -- | TOT RENEW : 2 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120876627 |
| CREATED | CREATED : 2019-06-26 |
| RECORD Id | RECORD # : i13198920 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Cost, normal purchase price | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | 50.00 | AIT SSPR no.CM-17-01 | 30050120960116 | 18/08/2026 | 1 | 18/08/2026 | 20-AIT Publication | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | 50.00 | AIT SSPR no.CM-17-01 | 30050120960082 | 18/08/2026 | 2 | 18/08/2026 | 20-AIT Publication | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 18/08/2026 | AIT SSPR no.CM-17-01 | 30050120876627 | 18/08/2026 | 1 | 18/08/2026 | 40-Archives |

AI Search