Contractual conditions and major delays in a thermal power plant construction project : (Record no. 22936)

MARC details
000 -LEADER
fixed length control field 03380nas a2200373 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818085043.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200723s2018 th u m r mtt 0| eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b12348430
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Proj. no.MPM-CM-18-20
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nguyen Thi Huyen Trang
245 10 - TITLE STATEMENT
Title Contractual conditions and major delays in a thermal power plant construction project :
Remainder of title a case study of Vietnam
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pathum Thani, Thailand :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent 65 leaves :
Other physical details ill.
490 1# - SERIES STATEMENT
Series statement Project ;
Volume/sequential designation no. MPM-CM-18-20
500 ## - GENERAL NOTE
General note A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction, Engineering and Infrastructure Management
502 ## - DISSERTATION NOTE
Dissertation note Project (M. Eng.) - Asian Institute of Technology, 2018
520 ## - SUMMARY, ETC.
Summary, etc. Rapid economic development in Vietnam in recent years has led to the increase in power demand. With a variety of energy sources such as coal, gas, oil etc., the power sector's structure of Vietnam has shifted from hydropower to thermal power. However, the delay of construction of thermal power plant has become a concerning problem to ensure energy security and stability for the country's economic development. Based on literature review from books, journal articles and other sources, construction delay is caused by many factors such as owner- related, contractor- related, consultant- related and external- related factors. As a result, this research is conducted to study one particular case of delay in thermal power plant project to identify root causes of delay during construction stage in comparison with theory, especially delays related with contract conditions and administration. Ten major delay problems of this case are analyzed carefully based on actual activities on site and related contractual conditions. Associated contract management of the owner and subsequent solutions to mitigate the problem are discussed in detail as well. From all the analysis, specific recommendations are given to each delay event to help owner avoid or minimize the effect of similar problem in the future. Moreover, general lessons learnt from the study case are given on how to select competent contractors, prepare good contract document and improve management skill of owner's management board to carry out future projects successfully on time.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Electric power-plants
General subdivision Construction
Geographic subdivision Vietnam
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction contracts
Geographic subdivision Vietnam
Form subdivision Case studies
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Hadikusumo, Bonaventura H. W.,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Chotchai Charoenngam,
Relator term Examination Committee
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Santi Charoenpornpattana,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Vietnam Electricity (EVN),
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Project ;
Volume/sequential designation no. MPM-CM-18-20
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b12348430
b mnait
c m
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 231005
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 200723
First date, FD (RLIN) m
-- a
-- m
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120982094
CREATED CREATED : 2020-07-23
RECORD Id RECORD # : i13284034
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120982086
CREATED CREATED : 2020-07-23
RECORD Id RECORD # : i13284046
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 50.00   AIT Proj. no.MPM-CM-18-20 30050120982094 18/08/2026 1 18/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 50.00   AIT Proj. no.MPM-CM-18-20 30050120982086 18/08/2026 2 18/08/2026 20-AIT Publication
คัดลอกแล้ว!