The effect of a shunt reactor on the switching overvoltage of 500 kV transmission lines : (Record no. 34106)

MARC details
000 -LEADER
fixed length control field 03160nam a2200397 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818094842.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 011098s1997 th r 0000|0 eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b11699747
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no.ET-97-02
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Chairoj Panprommin
245 14 - TITLE STATEMENT
Title The effect of a shunt reactor on the switching overvoltage of 500 kV transmission lines :
Remainder of title case of EGAT, 500 kV BSP-CBG-SNO-CHW transmission lines
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1997
300 ## - PHYSICAL DESCRIPTION
Extent 78 leaves +
Accompanying material 1 online resource
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. ET-97-02
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology, 1997
520 ## - SUMMARY, ETC.
Summary, etc. The analysis of the effect of shunt reactor on the Switching over-voltage of 500 kV system can be done by the EMTP program which is the famous transient simulation program in the world. The shunt reactor can be reduced the switching over-voltage, but for each transmission line, the characteristics are not the same. So, there are many options to use the shunt reactor such as installed at both-end of transmission line, at the receiving-end of the line and no need shunt reactor. Each case is suitable for each line. The study have been done by modeling the three 500 kV transmission lines which have different line parameter and simulating the switching overvoltage which can be occurred by many cases and different parameters. The study consist of the steady state voltage simulation also. Finally we can summarized the output results that shunt reactor can be reduced switching overvoltage but the steady state voltage is the main factor for shunt reactor sizing. We can selected the suitable shunt reactor sized for each line as the following: The 33 km 500 kV transmission line (short length) need no shunt reactor. The 95 km 500 kV transmission line (medium length) need 62 MVAr shunt reactor at the receiving end substation. The 285 km 500 kV transmission line (long length) need shunt reactor at both ends, totally 249 MVAr or 124.5 MVAr for each end.
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Electric lines
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Electric reactors, Shunt
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Yu, Chin Yi,
Relator term Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Srivastava, Suresh Chandra,
Relator term Examination committee
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Surapong Chiraratananon,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Electricity Generating Authority of Thailand,
Relator term Scholarship donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. ET-97-02
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B13667">http://203.159.5.9/ait-thesis/detail.php?q=B13667</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b11699747
b mnait
c y
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240403
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 980408
First date, FD (RLIN) m
-- a
-- y
-- 4
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 22-AIT Thesis (Replacement)
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120713499
CREATED CREATED : 2014-03-02
RECORD Id RECORD # : i12754870
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120366363
CREATED CREATED : 2016-06-14
RECORD Id RECORD # : i13035575
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 50.00   AIT Thesis no.ET-97-02 30050120713499 18/08/2026 3 18/08/2026 22-AIT Thesis (Replacement)
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026     AIT Thesis no.ET-97-02 30050120366363 18/08/2026   18/08/2026 40-Archives
คัดลอกแล้ว!