Effect of upstream diversions and downstream diversions on overall operation of Choshui pumped storage hydropower system, Taiwan, R.O.C. (Record no. 34769)

MARC details
000 -LEADER
fixed length control field 04863nam a2200433 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818095125.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190598 th eng
035 ## - SYSTEM CONTROL NUMBER
System control number .b10228962
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no. WA-83-7
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Lin, I-wan
245 10 - TITLE STATEMENT
Title Effect of upstream diversions and downstream diversions on overall operation of Choshui pumped storage hydropower system, Taiwan, R.O.C.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1982
300 ## - PHYSICAL DESCRIPTION
Extent vii, 55, c. 31-37 p.
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. WA-83-7
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, school of Engineering and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology,1982
520 ## - SUMMARY, ETC.
Summary, etc. A simulation model is developed to represent the overall Choshui hydro power system. The whole system consists of six reservoirs or ponds, namely, Wu Sheh, Wu Chieh, Sun Moon Lake, ·Ming Hu and Ming Tan lower reservoir, and Chi Chi reservoir, two pumped storage plants ·Ming Hu and Ming Tan and four conventional hydro plants Wu Sheh, Ta Kuan, Chu Kung, and Shui Li. (Figs.1 .1 , 1.2, and 1.3). The upstream diversion consisting of at most seven diversion dams, will divert the flow of each creek into a connecting tunnel and converge into the Sun Moon Lake. The Chi Chi dam is located at the downstream of the power system tailrace and headwork of the existing canal diversions, so its main functions are to regulate the uncontrolled flow and the release during the peak hour, and provide the additional regulated flow from the reservoir for irrigation purpose. The reservoirs and power plants are connected both in a series and in parallel. The system generates electricity and provides water for irrigation and downstream requirements. The hydrological data used cover 28 years from 1954 to 1981, while the recording of irrigation demand is 7 years from 1972 to 1978. One of the pumped storage projects, Ming Hu, is now under construction. Therefore, the case of excluding pumped storage project in operation will not exist in the system. Consequently, the most feasible combination of the Wu Sheh and Sun Moon Lake rule curves is recommended based upon the maximum power benefit and minimum downstream water shortage for irrigation. For estimating the power benefit, the peak and offpeak power rates are considered, at 2 . 09 NT$/kWh for peak power and at 1.25 NT$/kWh for offpeak power. The operating policy which yields the maximum power benefit and minimum downstream water shortage is selected. Two different release policies are considered: irrigation predominated a nd power generation predominated. Based on the objective of the simulation the case which yields highest maximum power benefit and minimum downstream water shortage should be selected. It is found that the highest maximum power benefit occur when taking power generation as higher priority. In this case the rule curve of Sun Moon Lake indicates that the Lake should be kept full at all time while for the Wu Sheh reservoir, the rule curve No. 13 for comparison purpose is selected. The case when irrigation is considered predominated is run. The maximum power benefit obtained is found to be lower than t he case when considering power generation as higher priority though less downstream water shortage can be achieved. In the study, t he MH and MT psp are operated under mixed pumped condition.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water-power electric plants
General subdivision Taiwan
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Tawatchai Tingsanchali,
Relator term Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Arbhabhirama Anat,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Nguyen Due Lien,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Taiwan Power Company, R.O.C.,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. WA-83-7
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B21408">http://203.159.5.9/ait-thesis/detail.php?q=B21408</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b10228962
b mnait
c s
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 241008
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 2
Cataloger's initials, CIN (RLIN) 951012
First date, FD (RLIN) m
-- a
-- s
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003069944
CREATED CREATED : 1994-05-17
RECORD Id RECORD # : i10278989
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003069951
CREATED CREATED : 1994-05-17
RECORD Id RECORD # : i10278990
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050160036041
CREATED CREATED : 2016-05-02
RECORD Id RECORD # : i12877542
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050121028202
CREATED CREATED : 2022-10-18
RECORD Id RECORD # : i13408549
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type Cost, normal purchase price
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026   AIT Thesis no. WA-83-7 30050003069944 18/08/2026 1 18/08/2026 20-AIT Publication  
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026   AIT Thesis no. WA-83-7 30050003069951 18/08/2026 2 18/08/2026 20-AIT Publication  
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026   AIT Thesis no. WA-83-7 30050160036041 18/08/2026   18/08/2026 40-Archives  
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026   AIT Thesis no. WA-83-7 30050121028202 18/08/2026 3 18/08/2026 20-AIT Publication 50.00
คัดลอกแล้ว!