The feasibility of the land readjustment technique as a tool to improve urban development and land supply in Dhaka, Bangladesh (Record no. 43593)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 04744nam a2200385 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260818113529.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 070898 th eng |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b1141019x |
| 099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
| Classification number | AIT Thesis no.HS-94-22 |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Mowla, Quazi Sirajul |
| 245 14 - TITLE STATEMENT | |
| Title | The feasibility of the land readjustment technique as a tool to improve urban development and land supply in Dhaka, Bangladesh |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bangkok : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 1994 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 170 leaves |
| 490 1# - SERIES STATEMENT | |
| Series statement | Thesis ; |
| Volume/sequential designation | no. HS-94-22 |
| 500 ## - GENERAL NOTE | |
| General note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Thesis (M.Sc.) - Asian Institute of Technology, 1994 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | The south-eastern fringe of Dhaka (i.e. the DND agricultural project zone) is protected from flood by embankment all around the area. Due to the scarcity of flood free areas at the fringe of Dhaka, the DND project zone is transforming very fast from rural to urban uses, but this is in an unplanned and haphazard way. In various studies and reports, the zone has been identified as having high potential for urban development in the next decade. It has also been urged by different consultants and experts to adopt new innovative techniques for urban land development and to test them in specified areas there. The Capital Development Authority (RAJUK) is trying to implement a 'land readjustment (LR)' demonstration project on a small area within the DND zone, which reflects the government's awareness of the problems there. The LR technique has the advantage of achieving the planned development of serviced lands with no or minimum cost to government, as the costs are recovered through the sale of a portion of the serviced land. It is successful in the countries that it is practiced in and highly praised through different publications, reports and seminars. Bangladesh has attempted to check the viability of the technique very recently but the model devised for land readjustment deviated quite significantly from the standardized international LR technique. The present study aims to see the viability of a LR scheme which follows every steps of a true LR scheme. The study also aimed to find out the limitations on LR in Dhaka and to examine the prospects and the possible ways to overcome these. The study area selected is an area of 9.7 hectare of land, near to government's site for its 'LR' project. The study area is mostly vacant, and consisted of 117 separate land parcels which is natural for a flood free urban areas of Dhaka. In the proposed LR scheme, the landowners will have to give up 22.15 percent of their land for roads and other community facilities plus 11.46 percent of the serviced plots to be sold to recover the project cost. The landowners would be left with 66.39 percent of their original land as building plots. They will have an estimated net land value gain of about 88.5 percent after cost recovery, which should make the scheme readily acceptable and help to bring this area into for efficient urban use through the market. The draft LR scheme seems to be technically and financially feasible. Fifty four out of 98 (55.1 % ) landowners, expressed their inclination towards the first outline scheme and the rest ( 44.9%) were skeptical about the project. To overcome the skepticism, the study indicates alternate approaches within the existing limitations. To make the LR technique socially and politically more acceptable, some legislative and institutional reform might be required to make the project successful. However, sincere willingness from beneficiary groups for the planned urban development might override all the apparent hindrances. |
| 650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | City planning |
| General subdivision | Bangladesh |
| -- | Dhaka |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Archer, Ray W., |
| Relator term | Chairperson |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Kammeier, Hans Detlef, |
| Relator term | Examination Committee |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Miah, M.A. Quader, |
| Relator term | Examination Committee |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Norwegian Agency for Development (NORAD), |
| Relator term | Scholarship Donor |
| 810 2# - SERIES ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology. |
| Title of a work | Thesis ; |
| Volume/sequential designation | no. HS-94-22 |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href="http://203.159.5.9/ait-thesis/detail.php?q=B15999">http://203.159.5.9/ait-thesis/detail.php?q=B15999</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b1141019x |
| b | mnait |
| c | s |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 251211 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 2 |
| Cataloger's initials, CIN (RLIN) | 951104 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | s |
| -- | 4 |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 22-AIT Thesis (Replacement) |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 40-Archives |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120710669 |
| CREATED | CREATED : 2014-04-28 |
| RECORD Id | RECORD # : i12791635 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120374532 |
| CREATED | CREATED : 2016-07-06 |
| RECORD Id | RECORD # : i13019491 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Cost, normal purchase price | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | 50.00 | AIT Thesis no.HS-94-22 | 30050120710669 | 18/08/2026 | 3 | 18/08/2026 | 22-AIT Thesis (Replacement) | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 18/08/2026 | AIT Thesis no.HS-94-22 | 30050120374532 | 18/08/2026 | 1 | 18/08/2026 | 40-Archives |

AI Search