Analysing factors causing road construction delay in Bhutan (Record no. 4439)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 03837nas a2200409 a 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260817162241.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 191125s2017 th u m rtt 000 a eng d |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b12296430 |
| 099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
| Classification number | AIT Caps. Proj. no.CIE-17-06 |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Sharma, Prakash |
| 245 10 - TITLE STATEMENT | |
| Title | Analysing factors causing road construction delay in Bhutan |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Pathum Thani : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 2017 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 73 leaves : |
| Other physical details | ill. |
| 490 1# - SERIES STATEMENT | |
| Series statement | Caps. Proj. ; |
| Volume/sequential designation | no. CIE-17-06 |
| 500 ## - GENERAL NOTE | |
| General note | A capstone project report submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in Engineering Civil and Infrastructure Engineering, School of Engineering and Technology |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Capstone Project (B.Sc.)-Asian Institute of Technology, 2017 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | The delay in construction project has almost become a part of project; however it can have detrimental effects on the development of countries like Bhutan with small economy. This research was carried out with aim to find the top ten factors causing road construction delay in Bhutan. The factors were identified based on frequency of occurrence, degree of severity and importance index. Degree of severity assessed the impact of each factors on time, cost and quality. There were 106 valid questionnaire collected and 54 from Department of Road (DoR) those were 52 from construction companies. Five experts were interviewed for in-depth discussion of top ten delays factors. The top-ten list of factors based on frequency of occurrence included almost all the factors that were in the list of top-ten based on degree of severity. Rainfall was ranked one in both case and rest of the factors had different sequence in those two lists. This study came up with some of the prominent factors causing delay in road construction of Bhutan. These are the factors listed in top ten based on importance index calculated using the frequency of index and severity index; Rainfall, Dependency on imported materials, Award project to lowest bid price, Shortage of labors, Poor terrain condition (steep slopes), Progress payment Delay, Delayed payments to labors, Delay of construction materials delivery, Insuf ficient project time frame, Existing traffic/ traffic control delay, Rework because of error during construction, Poor soil quality, Financial Difficulty of contractor, Low productivity of labor. The assessment on impact of factors on time, cost and quality from the ANOVA test revealed that there is significant difference between time, cost and quality. Time had highest and significantly different mean score compared to cost and quality, indicating delay has highest impact on time and low impact on quality. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Road construction industry |
| Geographic subdivision | Bhutan |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Road construction contracts |
| Geographic subdivision | Bhutan |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Santoso, Djoen San, |
| Relator term | Chairperson |
| 700 0# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Chotchai Charoenngam, |
| Relator term | Examination Committee |
| 810 2# - SERIES ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology. |
| Title of a work | Caps. Proj. ; |
| Volume/sequential designation | no. CIE-17-06 |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href="http://203.159.5.9/ait-thesis/detail.php?q=B14839">http://203.159.5.9/ait-thesis/detail.php?q=B14839</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b12296430 |
| b | mnait |
| c | m |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 240411 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 0 |
| Cataloger's initials, CIN (RLIN) | 191125 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | m |
| -- | 0 |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 40-Archives |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 61-CD-ROM |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 20-AIT Publication |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120395032 |
| CREATED | CREATED : 2019-07-03 |
| RECORD Id | RECORD # : i13154989 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : - |
| CREATED | CREATED : 2019-07-03 |
| RECORD Id | RECORD # : i13154990 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120952162 |
| CREATED | CREATED : 2019-11-25 |
| RECORD Id | RECORD # : i13233336 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type | Cost, normal purchase price |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 17/08/2026 | AIT Caps. Proj. no.CIE-17-06 | 30050120395032 | 17/08/2026 | 1 | 17/08/2026 | 40-Archives | |||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 17/08/2026 | AIT Caps. Proj. no.CIE-17-06 | 17/08/2026 | 17/08/2026 | 61-CD-ROM | |||||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 17/08/2026 | AIT Caps. Proj. no.CIE-17-06 | 30050120952162 | 17/08/2026 | 1 | 17/08/2026 | 20-AIT Publication | 50.00 |

AI Search