Analysis of performance measures of Kanban production system (Record no. 4918)

MARC details
000 -LEADER
fixed length control field 03223nam a2200409 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260817162414.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 300698 th eng
035 ## - SYSTEM CONTROL NUMBER
System control number .b10081690
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no. IE-92-05
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Arulanantham, George C.
245 10 - TITLE STATEMENT
Title Analysis of performance measures of Kanban production system
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1992
300 ## - PHYSICAL DESCRIPTION
Extent 37, A15, B6, C7 leaves
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. IE-92-05
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology, 1992
520 ## - SUMMARY, ETC.
Summary, etc. In this paper, we analyze the performance measures (inventory and backorder) of the Kanban discipline for a production line, consisting of serial production stages. There is a fixed number of Kanban in each stages. A part produced at a stage must acquire one of these Kanbans to enter the succeeding stage and must continue to hold it throughout it sojourn there. Any unattached Kanbans that are present in the stage are to be found on the bulletin board and are considered as the request for the parts produced at preceding stage. Thus intermediate-product inventory is divided into two parts, inventory at the output buffer and inventory at the succeeding stage's input queue. There is a finite pool for raw part preceding the first stage and finite buffer for the demand following the final stage. We decompose each stage as a semi-autonomous component and construct a stochastic model for each isolated stage. We explained the number of parts in the output buffer and number of Kanbans in the bulletin board and number of parts in the input queue as a Markov process and provided the scheme to analyze the performance measures of the system. In addition to this, we introduced a stage with signal Kanban (produce the product as a lot) and provide the method to analyze the system.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Production management
General subdivision Mathematical models
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Fujiwara, Okitsugu,
Relator term Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Sharif, M. Nawaz,
Relator term Examination Committee
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Vilas Wuwongse,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element The Government of Finland,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. IE-92-05
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B17140">http://203.159.5.9/ait-thesis/detail.php?q=B17140</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b10081690
b mnait
c s
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240410
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 2
Cataloger's initials, CIN (RLIN) 951012
First date, FD (RLIN) m
-- a
-- s
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003074241
CREATED CREATED : 1995-10-13
RECORD Id RECORD # : i10083698
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003074233
CREATED CREATED : 1995-10-13
RECORD Id RECORD # : i10083704
LPATRON LPATRON : 1017262
LCHKIN LCHKIN : 2007-03-24
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 5
-- TOT RENEW : 2
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050160075627
CREATED CREATED : 2016-04-21
RECORD Id RECORD # : i12942868
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 17/08/2026 10.00   AIT Thesis no. IE-92-05 30050003074241 17/08/2026 1 17/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 17/08/2026 10.00   AIT Thesis no. IE-92-05 30050003074233 17/08/2026 2 17/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 17/08/2026     AIT Thesis no. IE-92-05 30050160075627 17/08/2026 1 17/08/2026 40-Archives
คัดลอกแล้ว!