Analyzing a supplier's decision under the combination of long-term and penalty contracts (Record no. 5392)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02246nam a2200265 a 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260817162540.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b12360181 |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Marasinghe, Vishala Rashmini |
| 245 10 - TITLE STATEMENT | |
| Title | Analyzing a supplier's decision under the combination of long-term and penalty contracts |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Pathumthani : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 2019 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Accompanying material | 1 online resource |
| 500 ## - GENERAL NOTE | |
| General note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Industrial and Manufacturing Engineering |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Thesis (M. Eng.) -- Asian Institute of Technology, 2019 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | Game-theoretic approach is commonly used in supply chain management for mathematically analyses the effect of controllable factors on the decision parameters for make the supply chain more efficient and higher profitable for its members. Supply contracts are legal agreements which enhance collaboration and coordination among supply chain members in order to optimize supply chain performance. A combination of a long-term contract and a penalty contract for multiple periods in between a single supplier and a retailer is considered in this study (two stage supply contract). Demand is stochastic but uniformly distributed over the selling seasons of periods. The supplier{u2019}s capacity decision is required to be taken at the beginning of period when demand is unknown which means that before receiving the orders from the retailer. In this study, a mathematical model is constructed to examine and investigate supplier{u2019}s capacity decision when controllable factors are changed. The performance in term of supply chain coordination and profit allocation is considered by analyzing the total profits of both members individually. |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Huynh, Trung Luong, |
| Relator term | Chairperson |
| 700 0# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Pisut Koomsap, |
| Relator term | Examination Committee |
| 700 0# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Mongkol Ekpanyapong, |
| Relator term | Examination Committee |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology Fellowship, |
| Relator term | Scholarship donor |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href="http://203.159.5.9/ait-thesis/detail.php?q=B08701">http://203.159.5.9/ait-thesis/detail.php?q=B08701</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b12360181 |
| b | mnait |
| c | j |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 240425 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 0 |
| Cataloger's initials, CIN (RLIN) | 200108 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | j |
| -- | 0 |
No items available.

AI Search