Heuristics for job shop scheduling problems with progressive weighted tardiness penalties and inter-machine overlapping sequence-dependent setup times (Record no. 54887)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 06441nas|a2200493 a 4500 |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260818133458.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 060124s2005 th uu|m rtt 0| a1eng d |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | .b11978429 |
| 099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
| Classification number | AIT Diss. no.ISE-05-02 |
| 100 0# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Chatpon Mongkalig |
| 245 10 - TITLE STATEMENT | |
| Title | Heuristics for job shop scheduling problems with progressive weighted tardiness penalties and inter-machine overlapping sequence-dependent setup times |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Pathum Thani, Thailand : |
| Name of publisher, distributor, etc. | Asian Institute of Technology, |
| Date of publication, distribution, etc. | 2005 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 137 p. : |
| Other physical details | ill. |
| 490 1# - SERIES STATEMENT | |
| Series statement | Dissertation ; |
| Volume/sequential designation | no. ISE-05-02 |
| 500 ## - GENERAL NOTE | |
| General note | A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Engineering, School of Advanced Technologies |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Thesis (Ph.D.) - Asian Institute of Technology, 2005 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | This dissertation looks into new job shop scheduling problems with new measures of performance and new constraints. New heuristic methods, which are sequential NT-T-L heuristic approach and sequential NT-T-E&T heuristic method, are developed to solve job shop scheduling problems with earliness and tardiness penalties. The experimental results indicate that active schedules generated by the sequential NT-T-E&T heuristic method is significantly superior to the efficient bi-direction scheduling algorithm, and other heuristics. The performance measures proposed in this research are new customer-based measures of performance. The repetitive penalties increase at a constant progressive rate, depending on how many times late delivery of finished products to each customer occurs. The new performance measures are as follows: (i) total progressive weighted tardiness and (ii) total earliness and progressive weighted tardiness. New constraints, which are intermachine overlapping sequence-dependent setup times, are proposed in the new job shop scheduling problems. To reduce machine idle time and generate more effective complete schedules, direct processing times of preceding operations and machine setups of successive operations of the same job (batch of parts) are initiated simultaneously. New heuristic methods, which are the MPWT heuristic method, and five modified priority rules - LWKRS, MWKRS, SMST, SSPT, and SSTPT rules, are developed to solve conflicting operations in the set of active and nondelay schedules. There are three important experiments. The objective of the first experiment is to determine the necessity of sequence-dependent setup time consideration in the priority rules to solve the conflicting operations in the set of active and nondelay schedules. The experimental results indicate that, based on the following measures of performance: (i) total progressive weighted tardiness (ii) total earliness and progressive weighted tardiness and (iii) total earliness and tardiness, the modified priority rules with sequence-dependent setup time consideration are superior to the classical priority rules. The objective of the second experiment is to compare the active schedules generated by the MPWT heuristic method with the optimal solution. Based on total earliness and progressive weighted tardiness, it can be found that four out of ten results of the proposed heuristic procedure yield the optimal solution, and the percentage of the difference between the results of the proposed heuristic approach and the optimal solution are less than 20%. Therefore, the modified active schedule generation algorithm using the MPWT heuristic method yields very good results with significantly less computational time. The objective of the third experiment is to compare the proposed MPWT heuristic method with efficient heuristics, which are the BATCS, SMST, and LWKRS rules for solving the conflicting operations in the set of active schedules. The results obtained by the third experiment indicate that for solving the conflicting operations in the set of active schedules, the proposed MPWT heuristic method is superior to the BATCS, SMST, and LWKRS rules based on total earliness and progressive weighted tardiness, and total earliness and tardiness performance measures. An automotive parts factory is selected to be a case study. The MPWT heuristic method is then compared with other efficient heuristics based on the real scheduling data. The average of total earliness and progressive weighted tardiness of the schedules obtained by the modified active schedule generation algorithm using the MPWT heuristic method is lower than that of the modified active schedule generation algorithm using the sequential NT-T-E&T heuristic method and the BATCS rule, the modified nondelay schedule generation algorithm using the SSPT rule and the modified nondelay schedule generation algorithm using the EDD rule by 8.8%, 13.15%, 29.7%, and 30.95%, respectively. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Heuristic programming |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Production scheduling |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Tabucanon, Mario T., |
| Relator term | Chairperson |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Paul, Himangshu, |
| Relator term | Examination Committee |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Bohez, Erik L.J., |
| Relator term | Examination Committee |
| 700 0# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Nguyen Van Hop, |
| Relator term | Examination committee |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Cheng, T. C. Edwin, |
| Relator term | Examination committee |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | The Royal Thai Government, |
| Relator term | Scholarship donor |
| 710 2# - ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Dhurakij Pundit University, Thailand, |
| Relator term | Scholarship donor |
| 810 2# - SERIES ADDED ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | Asian Institute of Technology. |
| Title of a work | Dissertation ; |
| Volume/sequential designation | no. ISE-05-02 |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| Materials specified | Full-Text |
| Uniform Resource Identifier | <a href=" http://203.159.5.9/ait-thesis/detail.php?q=B09406"> http://203.159.5.9/ait-thesis/detail.php?q=B09406</a> |
| 907 ## - LOCAL DATA ELEMENT G, LDG (RLIN) | |
| a | .b11978429 |
| b | mnait |
| c | u |
| 902 ## - LOCAL DATA ELEMENT B, LDB (RLIN) | |
| a | 240826 |
| 998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
| Operator's initials, OID (RLIN) | 0 |
| Cataloger's initials, CIN (RLIN) | 060113 |
| First date, FD (RLIN) | m |
| -- | a |
| -- | u |
| -- | 0 |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnarc |
| 945 ## - LOCAL PROCESSING INFORMATION (OCLC) | |
| l | mnait |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 20-AIT Publication |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 22-AIT Thesis (Replacement) |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | 40-Archives |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120905681 |
| CREATED | CREATED : 2006-01-13 |
| RECORD Id | RECORD # : i12471203 |
| LPATRON | LPATRON : 1018146 |
| LCHKIN | LCHKIN : 2009-03-14 |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 1 |
| -- | TOT CHKOUT : 6 |
| -- | TOT RENEW : 2 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050120594865 |
| CREATED | CREATED : 2012-08-16 |
| RECORD Id | RECORD # : i12687388 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050160002456 |
| CREATED | CREATED : 2016-02-17 |
| RECORD Id | RECORD # : i1288375x |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 0 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| 909 ## - LOCAL ITEMS USED | |
| Barcode | Barcode : 30050121006182 |
| CREATED | CREATED : 2021-05-02 |
| RECORD Id | RECORD # : i13320865 |
| LPATRON | LPATRON : 0 |
| LCHKIN | LCHKIN : - |
| RENEWALS | # RENEWALS : 0 |
| -- | # OVERDUE : 0 |
| -- | IUSE3 : 1 |
| -- | TOT CHKOUT : 0 |
| -- | TOT RENEW : 0 |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Cost, normal purchase price | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | 50.00 | AIT Diss. no.ISE-05-02 | 30050120905681 | 18/08/2026 | 1 | 18/08/2026 | 20-AIT Publication | ||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 18/08/2026 | AIT Diss. no.ISE-05-02 | 30050120594865 | 18/08/2026 | 3 | 18/08/2026 | 22-AIT Thesis (Replacement) | |||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | Archives | 18/08/2026 | AIT Diss. no.ISE-05-02 | 30050160002456 | 18/08/2026 | 1 | 18/08/2026 | 40-Archives | |||||
| Available for Loans | Asian Institute of Technology Library | Asian Institute of Technology Library | AIT Publications | 18/08/2026 | 50.00 | AIT Diss. no.ISE-05-02 | 30050121006182 | 18/08/2026 | 2 | 18/08/2026 | 20-AIT Publication |

AI Search