Material requirements planning for a sanitaryware manufacturing company (Record no. 73728)

MARC details
000 -LEADER
fixed length control field 03290nas|a2200385 i 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818154526.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 121095s1981 th uu m rtt 00| a1eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b10425573
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT SSPR no. CA-81-5
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Iyer, Ramanan B.
245 10 - TITLE STATEMENT
Title Material requirements planning for a sanitaryware manufacturing company
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1981
300 ## - PHYSICAL DESCRIPTION
Extent 1 v. (various pagings)
490 1# - SERIES STATEMENT
Series statement Special studies project report ;
Volume/sequential designation no. CA-81-5
500 ## - GENERAL NOTE
General note A special study submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
502 ## - DISSERTATION NOTE
Dissertation note Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1981
520 ## - SUMMARY, ETC.
Summary, etc. This study is carried out with the main objective of developing a system to improve the material planning function of the sanitary ware manufacturing company. Presently, ASTL is following an intuitive approach to plan the material. The problem with the present system is that the company is overstocking the materials required for a minimum period of three months. This is due to the tact t hat the company is not able to schedule the orders when the materials are required. Another problem is, placing rush orders which~ means increased cost. For these reasons, the company should adopt an inventory control technique . The document flow of manual system is given in Appendix c. The major requirements of the raw materials collie from Mold shop, Slip house, and Glaze room. The exact requirements of the raw materials are computed from the end-product production schedule which is subjected to local and foreign demand. The company is operating on a make-to-order basis. The demand for the products varies from period to period so that a system, which replaces the averaging process (based on historical systems) that use statistical techniques for ordering materials independent of their relationship to the end product is needed. MRP has unique characteristics which include planning and control of demands based on dependent future requirements, rather than historical averages. Finally, the working of the MRP system and the necessary measures t o implement the system successfully are cited.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Sanitary supply industry
General subdivision Thailand
-- Inventory control
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Krisorn Jittorntrum,
Relator term Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Gupta, Gopal K.,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Hovde, Per,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element NORAD , Norway,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Special studies project report ;
Volume/sequential designation no. CA-81-5
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B21465">http://203.159.5.9/ait-thesis/detail.php?q=B21465</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b10425573
b mnait
c y
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 241211
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 2
Cataloger's initials, CIN (RLIN) 951012
First date, FD (RLIN) m
-- a
-- y
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 22-AIT Thesis (Replacement)
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120567390
CREATED CREATED : 2013-05-07
RECORD Id RECORD # : i12733969
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 1
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120345086
CREATED CREATED : 2016-06-15
RECORD Id RECORD # : i13039283
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 50.00   AIT SSPR no. CA-81-5 30050120567390 18/08/2026 3 18/08/2026 22-AIT Thesis (Replacement)
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026     AIT SSPR no. CA-81-5 30050120345086 18/08/2026   18/08/2026 40-Archives
คัดลอกแล้ว!