A model to estimate highway construction costs in Nepal (Record no. 77491)

MARC details
000 -LEADER
fixed length control field 03499cam a2200409 i 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818155507.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 251198s1991 th r 0000|00eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b10035217
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no. GT-90-19
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sthapit, Naresh
245 12 - TITLE STATEMENT
Title A model to estimate highway construction costs in Nepal
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1991
300 ## - PHYSICAL DESCRIPTION
Extent 99 p.
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. GT-90-19
500 ## - GENERAL NOTE
General note A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Engineering, School of Engineering and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology, 1991
520 ## - SUMMARY, ETC.
Summary, etc. In a developing country like Nepal, where in most cases the projects are externally financed, there is still the overiding tendency to overemphasise the minimisation of construction costs in a highway project. But the cost estimates to be used at the earlier stage of design, where only a limited data will be available for analysis, have usually been based on lump sum unit costs derived from historic data on similar schemes, which often may not give a satisfactory result. A generalised model is hence analysed which could be used for any part of the country in any topographical conditions to estimate the construction cost for a highway project at the route location stage with the constraints of Nepal Road Standards and current practice. The model basically consists of three parts for the estimation of earthwork cost, retaining wall cost and the bridge cost respectively. Each part of the model is independent to each other and hence can also be used independently. The basic input data required is the general topographical information of the area concerned in terms of topographical contoured maps. The model assumes a predetermined horizontal alignment and the centre line profile of the ground surf ace has to be prepared at around 1:10000 horizontal and 1:2000 vertical scale. The results obtained were satisfactory and hence can be used to estimate the parameters successfully. The estimate tested was well within the accuracy desired at the earlier stage of design and the statistical test on the accuracy of the mode l shows a satisfactory result.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Road construction
General subdivision Economic aspects
-- Nepal
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Mori, Hiroshi,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Yordphol Tanaboriboon,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Fukuda, Atsushi,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element DAAD (Federal Republic of Germany),
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. GT-90-19
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B17554">http://203.159.5.9/ait-thesis/detail.php?q=B17554</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b10035217
b mnait
c s
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240409
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 2
Cataloger's initials, CIN (RLIN) 951012
First date, FD (RLIN) m
-- a
-- s
-- 2
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003017018
CREATED CREATED : 1995-10-13
RECORD Id RECORD # : i10020548
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050003017026
CREATED CREATED : 1995-10-13
RECORD Id RECORD # : i1002055x
LPATRON LPATRON : 1011851
LCHKIN LCHKIN : 2000-02-10
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 1
-- TOT RENEW : 1
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120309314
CREATED CREATED : 2016-05-25
RECORD Id RECORD # : i12990930
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 10.00   AIT Thesis no. GT-90-19 30050003017018 18/08/2026 1 18/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 10.00   AIT Thesis no. GT-90-19 30050003017026 18/08/2026 2 18/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026     AIT Thesis no. GT-90-19 30050120309314 18/08/2026 1 18/08/2026 40-Archives
คัดลอกแล้ว!