Offshore construction planning and scheduling under resource constraints (Record no. 82600)

MARC details
000 -LEADER
fixed length control field 03182nas a2200409 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818170424.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 090907s2009 th uu|m rtt 0| a1eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b12067179
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no.OTM-09-02
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Boonyawat Buddhimetapong
245 10 - TITLE STATEMENT
Title Offshore construction planning and scheduling under resource constraints
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pathum Thani, Thailand :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent 146 p. :
Other physical details ill.
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. OTM-09-02
500 ## - GENERAL NOTE
General note C. 2 bounded in leaves
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Offshore Technology and Management, School of Engineering and Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology, 2009
520 ## - SUMMARY, ETC.
Summary, etc. The objective of this study is to propose a systematic planning procedure under resource constraints in offshore constructions. This study incorporates the statistics of engineering data into the planning package of the offshore construction project to predict the construction's duration based on the existed resource capacity. Once critical resources are identified, the best fitted commonly used continuous distribution for each set of engineering data can be considered by Chi-Square and Kolmogorov-Smimov test. Then the Monte Carlo simulation based on statistics of engineering data is used to create the probabilistic-based model. This model is able to generate the realistic project's duration, dominant critical path from the various resources in each activity and the success rate from the resource constraints in offshore construction. The proposed systematic procedure above was applied to 4 legs jacket fabrication as a case study of this paper. The result of this study can be applied for both the optimum resource allocation plan in resource planning stage and strategic decision making to prevent the liquidate damage or penalty in the bidding stage. Finally, the case study shows that the proposed procedure could be a powerful tool to reduce the uncertainty for more reliable planning package.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Offshore oil industry
General subdivision Planning
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Chiu, Gregory L.F.,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Poovadol Sirirangsi,
Relator term Co-Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Winai Ouypornprasert,
Relator term Co-Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Widjaja, Joko Harsono,
Relator term Examination Committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element RTG Fellowship,
Relator term Scholarship donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. OTM-09-02
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B03587 ">http://203.159.5.9/ait-thesis/detail.php?q=B03587 </a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b12067179
b mnait
c u
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240329
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 090907
First date, FD (RLIN) m
-- a
-- u
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 22-AIT Thesis (Replacement)
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120685747
CREATED CREATED : 2014-05-19
RECORD Id RECORD # : i12800752
LPATRON LPATRON : 1027019
LCHKIN LCHKIN : 2018-02-14
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 5
-- TOT CHKOUT : 7
-- TOT RENEW : 1
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050160006424
CREATED CREATED : 2016-03-23
RECORD Id RECORD # : i1290580x
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026 50.00   AIT Thesis no.OTM-09-02 30050120685747 18/08/2026 3 18/08/2026 22-AIT Thesis (Replacement)
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026     AIT Thesis no.OTM-09-02 30050160006424 18/08/2026 1 18/08/2026 40-Archives
คัดลอกแล้ว!