Assessment of the Burala Canal Irrigation System, Pakistan : (Record no. 9402)

MARC details
000 -LEADER
fixed length control field 03731nas a2200397 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260817163654.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 091207s2009 th uu|m rtt 0| a1eng d
035 ## - SYSTEM CONTROL NUMBER
System control number .b12070798
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no.WM-08-09
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Nabi, Abdul
245 10 - TITLE STATEMENT
Title Assessment of the Burala Canal Irrigation System, Pakistan :
Remainder of title an application of the MASSCOTE approach
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pathum Thani, Thailand :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent 1 online resource (70 leaves) :
Other physical details ill.
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. WM-08-09
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Water Engineering and Management
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Eng.) - Asian Institute of Technology, 2008
520 ## - SUMMARY, ETC.
Summary, etc. Irrigated agricultural plays an important role in the economy of Pakistan. Agriculture in Pakistan is fed by surface canal irrigation system and mostly the performance of canal irrigation system is poor. The overall objective of this study was to apply the MASSCOTE (Mapping System and Services for Canal Operation Techniques) approach for the modernization of an irrigation system in Pakistan to improve its performance. Burala Canal Irrigation System located in the Rechna Doab, Punjab province was selected for the study. Various steps of MASSCOTE approach were applied to meet the objectives of the study. The current performance was evaluated, weaknesses in the system were identified and then modernization actions were specified to improve the performance of the system. The analysis showed that the values of most of the internal indicators, like water delivery service, operation of the canal etc. were below average showing poor performance of the system. Among the various external indicators, cost recovery ratio of the system was about 45 percent and maintenance cost to revenue ratio was 0.47. The operational and maintenance expenditures were higher than the water charges collected/ assessed in the study area. The water fees collection had declined over the years. The staff salaries shared the maximum portion of the expenditures. The study found that water provided from the main canal to distributaries was quite equitable but large scale inequity existed at the minor canal levels. The water theft and tempered outlets were the main reasons of poor water delivery services. The analysis indicated that most of the offtake delivery structures were highly sensitive and their sensitivity increased with the decrease of head upstream side of the structure and vice versa. The structures with high sensitivity need to be operated more efficiently for better services
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Irrigation projects
General subdivision Evaluation
Geographic subdivision Pakistan
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Babel, Mukand Singh,
Relator term Chairperson
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Perret, Sylvain Roger,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Clemente, Roberto S.,
Relator term Examination Committee
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Sutat Weesakul,
Relator term Examination committee
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element The Netherlands,
Relator term Scholarship Donor
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. WM-08-09
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B04304 ">http://203.159.5.9/ait-thesis/detail.php?q=B04304 </a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b12070798
b mnait
c u
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 240329
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 091207
First date, FD (RLIN) m
-- a
-- u
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 22-AIT Thesis (Replacement)
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120550420
CREATED CREATED : 2014-03-31
RECORD Id RECORD # : i1278347x
LPATRON LPATRON : 1027755
LCHKIN LCHKIN : 2018-03-17
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 3
-- TOT CHKOUT : 1
-- TOT RENEW : 3
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050120233175
CREATED CREATED : 2016-01-04
RECORD Id RECORD # : i12921348
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 17/08/2026 50.00   AIT Thesis no.WM-08-09 30050120550420 17/08/2026 3 17/08/2026 22-AIT Thesis (Replacement)
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 17/08/2026     AIT Thesis no.WM-08-09 30050120233175 17/08/2026   17/08/2026 40-Archives
คัดลอกแล้ว!