Reanalysis of preloading with prefabricated vertical drains for the Bangkok-Chonburi Highway Project and the Outer Bangkok Ring Road Project (Record no. 97803)

MARC details
000 -LEADER
fixed length control field 03341nam a2200421 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260818175549.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field th eng
035 ## - SYSTEM CONTROL NUMBER
System control number .b11533614
099 #9 - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number AIT Thesis no. GE-95-13
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Wasu Likitwanagarn
245 10 - TITLE STATEMENT
Title Reanalysis of preloading with prefabricated vertical drains for the Bangkok-Chonburi Highway Project and the Outer Bangkok Ring Road Project
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok :
Name of publisher, distributor, etc. Asian Institute of Technology,
Date of publication, distribution, etc. 1996
300 ## - PHYSICAL DESCRIPTION
Extent 162 leaves
490 1# - SERIES STATEMENT
Series statement Thesis ;
Volume/sequential designation no. GE-95-13
500 ## - GENERAL NOTE
General note A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M. Eng.) - Asian Institute of Technology, 1996
520 ## - SUMMARY, ETC.
Summary, etc. In the Thailand Department of Highways (DOH) Projects of the, Second Bangkok Chonburi Highway and Outer Bangkok Ring Road Projects, the preloading with prefabricated vertical drain (PVD) were used to improve the subsoil layer. The instrumentation were installed to measure the behaviour of foundation soil under the highway embankment loading in the field. The observed settlement data were considered to provide us with reliable and direct information which are representative of the soil mass in the subsoil. In this study, soil parameters were determined by back-calculation. ASAOKA method was used to back-calculate the soil parameters from the monitoring data. The back-figured horizontal coefficient of consolidation (C11) was used to predict the amount and rate of settlements. Good agreement were obtained in case of ASAOKA method. One-dimensional and SKEMPTON & BJERRUM method were slightly higher in both highway embankment except section 2A/1 of SBCH which is rather high. The back-calculated C11 value of SBCH range from 8.6 to 87 m 2 /yr and 11 to 40 m 2 /yr for OBRR. The alternative construction sequence were predict by using the back-figured soil parameters in combination with SHANSEP method. The preloading time was reduced to about 2 to 4 months using the alternative construction sequence compared to the original proposed one
610 10 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Second Bangkok-Chonburi Highway Project
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Outer Bangkok Ring Road Project
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Vertical drains
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Bergado, Dennes T.,
Relator term Chairperson
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Noppadol Phien-Wej,
Relator term Examination Committee
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Sugimoto, M.,
Relator term Examination Committee
810 2# - SERIES ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Asian Institute of Technology.
Title of a work Thesis ;
Volume/sequential designation no. GE-95-13
856 ## - ELECTRONIC LOCATION AND ACCESS
Materials specified Full-Text
Uniform Resource Identifier <a href="http://203.159.5.9/ait-thesis/detail.php?q=B15104">http://203.159.5.9/ait-thesis/detail.php?q=B15104</a>
907 ## - LOCAL DATA ELEMENT G, LDG (RLIN)
a .b11533614
b mnait
c v
902 ## - LOCAL DATA ELEMENT B, LDB (RLIN)
a 241101
998 ## - LOCAL CONTROL INFORMATION (RLIN)
Operator's initials, OID (RLIN) 0
Cataloger's initials, CIN (RLIN) 960910
First date, FD (RLIN) m
-- a
-- v
-- 0
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnait
945 ## - LOCAL PROCESSING INFORMATION (OCLC)
l mnarc
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 20-AIT Publication
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type 40-Archives
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30020220000452
CREATED CREATED : 1995-04-13
RECORD Id RECORD # : i11836611
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30020220000445
CREATED CREATED : 1995-04-13
RECORD Id RECORD # : i11836623
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
909 ## - LOCAL ITEMS USED
Barcode Barcode : 30050160081732
CREATED CREATED : 2016-05-16
RECORD Id RECORD # : i1297805x
LPATRON LPATRON : 0
LCHKIN LCHKIN : -
RENEWALS # RENEWALS : 0
-- # OVERDUE : 0
-- IUSE3 : 0
-- TOT CHKOUT : 0
-- TOT RENEW : 0
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026   AIT Thesis no. GE-95-13 30020220000452 18/08/2026 1 18/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library AIT Publications 18/08/2026   AIT Thesis no. GE-95-13 30020220000445 18/08/2026 2 18/08/2026 20-AIT Publication
      Available for Loans Asian Institute of Technology Library Asian Institute of Technology Library Archives 18/08/2026   AIT Thesis no. GE-95-13 30050160081732 18/08/2026 1 18/08/2026 40-Archives
คัดลอกแล้ว!