Combined operation of fuse dike and service spillway
Call Number: AIT Thesis no. WA-84-8 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. WA-84-8Publication details: Bangkok : Asian Institute of Technology, 1983Description: 69 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1983 Summary: An investigation was carried out to determine the optimum operation of the service spillway of Chiew Larn Dam in order to maintain both the maximum surcharge and the limiting high water level in the reservoir as controlled by the height of the fuse dike. Utilizing the head-discharge relationship from both the service spillway and the emergency spillway , reservoir routing for various inflow design floods was carried out from a number of combinations of spillway gate opening . The results obtained yield a number of combination of rises of the water level and t he outflow discharge. It was found that by means of introducing the maximum normal high water level as the starting point a nd allowing the gates to be opened gradually , the increases of the outflow discharges at the early stage of operation is gradual when compare it with the cases of fixed gate opening or step opening.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) | 1 | Available | 30050003050399 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) | 2 | Available | 30050003050381 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. WA-84-8 (Browse shelf(Opens below)) | Available | 30050160035803 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1983
An investigation was carried out to determine the optimum operation of the service spillway of Chiew Larn Dam in order to maintain both the maximum surcharge and the limiting high water level in the reservoir as controlled by the height of the fuse dike. Utilizing the head-discharge relationship from both the service spillway and the emergency spillway , reservoir routing for various inflow design floods was carried out from a number of combinations of spillway gate opening . The results obtained yield a number of combination of rises of the water level and t he outflow discharge. It was found that by means of introducing the maximum normal high water level as the starting point a nd allowing the gates to be opened gradually , the increases of the outflow discharges at the early stage of operation is gradual when compare it with the cases of fixed gate opening or step opening.
There are no comments on this title.

AI Search