Flood alleviation plan for practical operation in Bangpakong - Prachinburi Basin

By: Call Number: AIT Thesis no.WM-15-22 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. WM-15-22Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2015Description: 104 leaves : ill. (some col.)Subject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2015 Summary: The Bangpakong - Prachinburi Basin was flood frequently . Then Royal Irrigation Department planned to enlarge some existing canal and create a new canal to be the diversion for reduce flood in Prachinburi city but these canal is locate in retention area . So this study w as study about effect of enlarging canal to be diversion in retention area. The study has done by using MIKE 11 to simulated flow in river and floodplain. After applied the case of enlarge existing canal together with created new canal then the results ha ve come out. The effective of this case is it can reduce flood depth at Prachinburi city about 4 cm. and reduced flood day by 1 - 2 days. The discharge flow through diversion canal about 400 MCM with the peak d ischarge at Khumon canal is 97 cms . By compare e nlarged canal case with existing canal case the enlarge canal can drain about 130 MCM. The enlarging canal can drain more water but there is still have flood in the area. Eventually, it can reduce depth and flood time but it just a little value. The sugge stions are enlarge some canal more such as Khumon up to 100 cms and Sanampho up to 70 cms.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.WM-15-22 (Browse shelf(Opens below)) 1 Available 30050120408298
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.WM-15-22 (Browse shelf(Opens below)) 2 Available 30050120408264
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.WM-15-22 (Browse shelf(Opens below)) Available 30050120229843

The Bangpakong - Prachinburi Basin was flood frequently . Then Royal Irrigation Department planned to enlarge some existing canal and create a new canal to be the diversion for reduce flood in Prachinburi city but these canal is locate in retention area . So this study w as study about effect of enlarging canal to be diversion in retention area. The study has done by using MIKE 11 to simulated flow in river and floodplain. After applied the case of enlarge existing canal together with created new canal then the results ha ve come out. The effective of this case is it can reduce flood depth at Prachinburi city about 4 cm. and reduced flood day by 1 - 2 days. The discharge flow through diversion canal about 400 MCM with the peak d ischarge at Khumon canal is 97 cms . By compare e nlarged canal case with existing canal case the enlarge canal can drain about 130 MCM. The enlarging canal can drain more water but there is still have flood in the area. Eventually, it can reduce depth and flood time but it just a little value. The sugge stions are enlarge some canal more such as Khumon up to 100 cms and Sanampho up to 70 cms.

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Water Engineering and Management

Thesis (M.Eng.) - Asian Institute of Technology, 2015

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!