A case study on nxm job shop scheduling problem using heuristic approach

By: Call Number: AIT Thesis no. 1154 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1154Publication details: Bangkok : Asian Institute of Technology, 1976Description: 77 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1976 Summary: This study describes a heuristic algorithm for seeking a quick and near optimal solution to the n jobs m machines job shop scheduling problem in which each job 4as a number of operations to be performed on the specified machines in an ordering which are not the same for all jobs. The model can handle different machines required sequences including l oops, job precedence structure and start- stop lag. The objective is to minimize the total operation time. The developed heuristic algorithm is an extensions of the heuristic rules of the jobs two machines scheduling problem. At any instant during the n operation the m machines problem can be converted into a two machine problem. One of this is the machine under consideration and the other machine represents the rest of the machines required by the job through the first one. In this study, the model has been applied to solve a real-world problem. The results are observed to be sat is factory.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1154 (Browse shelf(Opens below)) 2 Available 30050003022844
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1154 (Browse shelf(Opens below)) Available 30050160087754

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology, 1976

This study describes a heuristic algorithm for seeking a quick and near optimal solution to the n jobs m machines job shop scheduling problem in which each job 4as a number of operations to be performed on the specified machines in an ordering which are not the same for all jobs. The model can handle different machines required sequences including l oops, job precedence structure and start- stop lag. The objective is to minimize the total operation time. The developed heuristic algorithm is an extensions of the heuristic rules of the jobs two machines scheduling problem. At any instant during the n operation the m machines problem can be converted into a two machine problem. One of this is the machine under consideration and the other machine represents the rest of the machines required by the job through the first one. In this study, the model has been applied to solve a real-world problem. The results are observed to be sat is factory.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!