Availability estimation of a wire rope manufacturing plant
Call Number: AIT RSPR no. IE-86-5 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IE-86-5Publication details: Bangkok : Asian Institute of Technology, 1986Description: 69 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1986 Summary: This study attempts to estimate availability of an engineering industry manufacturing wire ropes. Availability as a measure of systems ' worth is very important for improving productivity of an organisation. In this study two methods namely time dependent availability and throughput availability are used to estimate single machine availability. Standard avilability f ormula and the Markov chain model were used to estimate the time-dependent availability. The throughput availability of the total plant was also estimated, which is being recently used as an alternative to time-dependent models for estimating production capability of a complex plant. A simulation model has been constructed to estimate throughput availability for different product paths. The effects of buffer level on throughput have been analysed. The programme is developed for IBM- PC which may facilitate decision support for plant managers.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-86-5 (Browse shelf(Opens below)) | 1 | Available | 30050003110946 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. IE-86-5 (Browse shelf(Opens below)) | 2 | Available | 30050003110938 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no. IE-86-5 (Browse shelf(Opens below)) | Available | 30050160109590 |
A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1986
This study attempts to estimate availability of an engineering industry manufacturing wire ropes. Availability as a measure of systems ' worth is very important for improving productivity of an organisation. In this study two methods namely time dependent availability and throughput availability are used to estimate single machine availability. Standard avilability f ormula and the Markov chain model were used to estimate the time-dependent availability. The throughput availability of the total plant was also estimated, which is being recently used as an alternative to time-dependent models for estimating production capability of a complex plant. A simulation model has been constructed to estimate throughput availability for different product paths. The effects of buffer level on throughput have been analysed. The programme is developed for IBM- PC which may facilitate decision support for plant managers.
There are no comments on this title.

AI Search