Setting WIP levels using factory signature curve in a ConWIP production system
Call Number: AIT Thesis no. ISE-98-43 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. ISE-98-43Publication details: Bangkok : Asian Institute of Technology, 1998Description: 47 pSubject(s): Online resources: Dissertation note: Thesis (M.Sc.) - Asian Institute of Technology, 1998 Summary: In this study we describe an approach for setting the Work In Process (WIP) inventory levels of products in a Con WIP production system using Factory Signature Curve (FSC). The approach starts by generating a reference FSC under the conditions and operating policy used by the factory. The FSC is then used to set an initial WIP level based on the target throughput that might meet the demand forecast. This WIP level setting is then tested using simulation model to verify that the resulted throughput is within the control limits of the target throughput. If not, the WIP level is increased or decreased by one and the process repeats until the throughput falls within the limits of the target throughput. The procedure is tested with hypothetical job shop for single product, two products and tlu-ee products cases.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ISE-98-43 (Browse shelf(Opens below)) | 1 | Available | 30050120814396 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ISE-98-43 (Browse shelf(Opens below)) | 2 | Available | 30050120814404 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ISE-98-43 (Browse shelf(Opens below)) | 1 | Available | 30050160098934 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies
Thesis (M.Sc.) - Asian Institute of Technology, 1998
In this study we describe an approach for setting the Work In Process (WIP) inventory levels of products in a Con WIP production system using Factory Signature Curve (FSC). The approach starts by generating a reference FSC under the conditions and operating policy used by the factory. The FSC is then used to set an initial WIP level based on the target throughput that might meet the demand forecast. This WIP level setting is then tested using simulation model to verify that the resulted throughput is within the control limits of the target throughput. If not, the WIP level is increased or decreased by one and the process repeats until the throughput falls within the limits of the target throughput. The procedure is tested with hypothetical job shop for single product, two products and tlu-ee products cases.
There are no comments on this title.

AI Search