Study and survey of available construction materials, equipment and labor in Thailand

By: Call Number: AIT Thesis no. 804 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 804Publication details: Bangkok : Asian Institute of Technology, 1975Description: 73 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1975 Summary: This research is aimed at building an adequate data and information system on the construction industry in Thailand, with special emphasis on how and where to. get major construction materials, equipment and labor forces. The past and present prices of materials and daily wages of labors were compiled and studied and an attempt is made to forecast their future values. Equipment available on rental basis in Bangkok and its rental rate are compiled in a suitable form for. general practical use. The available sizes and types of construction materials, the material costs and labor wage rates in each region are also studied .
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 804 (Browse shelf(Opens below)) 1 Available 30050003036158
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 804 (Browse shelf(Opens below)) Available 30050160092192

Thesis (M.Eng.) - Asian Institute of Technology, 1975

A thesis .submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology·, Bangkok, Thailand.

This research is aimed at building an adequate data and information system on the construction industry in Thailand, with special emphasis on how and where to. get major construction materials, equipment and labor forces. The past and present prices of materials and daily wages of labors were compiled and studied and an attempt is made to forecast their future values. Equipment available on rental basis in Bangkok and its rental rate are compiled in a suitable form for. general practical use. The available sizes and types of construction materials, the material costs and labor wage rates in each region are also studied .

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!