Behaviour of short piles in soft clay
Call Number: AIT Thesis no.GT-79-06 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. GT-79-06Publication details: Bangkok : Asian Institute of Technology, 1980Description: 93 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1980 Summary: Twenty reinforced concrete piles with a cross-section of 15 cm x 15 cm were constructed for this study. All the piles were 2 m long. They were spliced together at the site to form 4 m and 6 m spliced piles. Three of each group were driven into the ground. Short-term full scale load tests for determination of the failure load were carried out on five spliced-piles. One out of each group was subjected to long-term loading of which the design working load of 1 ton was applied and maintained constant throughout the testing period. Inclination of the spliced piles were measured by the strain-gauges mounted on PVC tubes. Pore water pressure were also measured during and after the driving and found that the excess pore pressure dissipated about 80% of its initial value with 14 days.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.GT-79-06 (Browse shelf(Opens below)) | 3 | Available | 30050120737936 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.GT-79-06 (Browse shelf(Opens below)) | 1 | Available | 30050160071121 |
A thesis submitted in the partial fulfilment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1980
Twenty reinforced concrete piles with a cross-section of 15 cm x 15 cm were constructed for this study. All the piles were 2 m long. They were spliced together at the site to form 4 m and 6 m spliced piles. Three of each group were driven into the ground. Short-term full scale load tests for determination of the failure load were carried out on five spliced-piles. One out of each group was subjected to long-term loading of which the design working load of 1 ton was applied and maintained constant throughout the testing period. Inclination of the spliced piles were measured by the strain-gauges mounted on PVC tubes. Pore water pressure were also measured during and after the driving and found that the excess pore pressure dissipated about 80% of its initial value with 14 days.
There are no comments on this title.

AI Search